Inspection History: EXCAVATION/LAYOUT REBAR & ZON
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/28/2010 | EXCAVATION/LAYOUT REBAR & ZON | Approved | IVRS - Inspection :* | |
| 04/29/2009 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 1) OK KITCHEN, GARAGE, FRONT ENTRY AREA INTERIOR LIBRARY 2) NOTE: NOTHING ON PLAN FOR INCLUSIVE HOME DESIGN |
|
| 02/02/2009 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 1) INSPECTED FOOTERS FOR STAIRS ON SOUTH SIDE AND THE REMAINDER OF ALL STEM WALL-AT FIRST FLOOR PATIO 2) OK TO GROUT CURBED WALL AND RETAINING WALL TO UPPER FLOOR |
|
| 01/27/2009 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 1) FTG OK FOR 4'-0" HIGH RADIUS WALL AT S/W CORNER PATIO WALL 2) RESTRAINING WALL AT N/W CORNER OF CONCRETE DRIVE FOR PARKING REQUIRES STEPPED FTG TOP AND BOTTOM 3) OK FTG FOR DRIVEWAY RESTRAINING WALL RUNNING EAST TO WEST APPROX 10'-12' FT |
|
| 12/22/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 1) INSPECTED EAST 1ST FLOOR FOOTINGS-OK TO POUR MEASURED 12'-2" FROM SET BACK |
|
| 11/20/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 1) F-1 FOOTER 2) F2A AND F2B FOOTER 3) F-5 NORTH GARAGE WALL ONLY 4) F-5 TO RAIDUS WALL ONLY SOUTH |