Inspection History Details
Inspection Status: Approved
Inspection History: FRAMING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/02/2007 | FRAMING | Approved | IVRS - Inspection :* | |
| 10/01/2007 | FRAMING | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) PRIOR ITEMS NOT DONE FROM 9/28/07 |
|
| 09/28/2007 | FRAMING | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) OK TO INSULATE 2) PATIO DOOR WEST HOLDOWN NOT NAILED 3) 3/4" ANCHOR BOLTS MISSING SW 9 |
|
| 09/25/2007 | FRAMING | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) MISSING JOB CARD AND ALL PREVIOUS INSPECTION REPORTS 2) REAR H.D. NOT NAILED 3) 12" TO CAN/PEX LINE KIT. 4) BLOCK MECH LAUNDRY 5) TOILET VENT MASTER MUST BE 6" ABOVE FLOOD RIM OF TOILET BEFORE GOING HORIZ. OR USE 45 DEGREE FITTINGS 6) BACK AT SHOWER VERT MSTR 7) REPLACE STUD 2ND FLOOR AT STAIR 8) STRAIGHTEN STUD EAST BEDROOM EXT., BOWED OUT STUCCO FRONT BED 9) NAILING FOR SHEETROCK STUD TOP OF STAIR (?) 10) MISSED 4' OF FLOOR NAILING, PLEASE SWEEP FLOOR SO IT CAN BE CHECKED |
|
| 09/19/2007 | FRAMING | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) ITEMS 1 & 10 FROM 9/17/07 NOT COMPLETE |
|
| 09/17/2007 | FRAMING | Denied | IVRS - Inspection : Work is not complete enough to inspect.| 950* 1) LATHE NOT COMPLETE 2) RED HEAD ANCHOR BOLTS REQUIRED WITHIN 12" OF PLATE SPLICES 3) SILL PLATE IN GARAGE WEST WALL SHOWS SIGNS OF ROT-REPLACE 4) HOLDOWN BOLT MISSING STAIR 5) PLUMBING OUT OF WALL AT STAIRS 6) FIRE BLOCK BROKEN AT STAIR 7) STAIR SHEARWALL MISSING A35 CLIPS 14/S1.1 8) GIRDER POST NOT CLIPPED TO HEADER 9) BLOCK DUCT BOOTS 10) SHEARWALL 9 NOT NAILED AT TRUSS 11) STOPPED INSPECTION-TOO MANY ITEMS |