Permit: T07CM03033

Parcel: 117060940


Addresses:

45 N 5TH AV


Inspection Status: Approved

Inspection History: BUILDING PRE-SLAB

Permit Number - T07CM03033

Inspection Description - BUILDING PRE-SLAB

Inspection Status - Approved

Date Description Inspector Results Comments
05/07/2010 BUILDING PRE-SLAB Approved IVRS - Inspection :*
05/03/2010 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
04/30/2010 BUILDING PRE-SLAB Partial Approval DRAINAGE PROTECTION OK AND TOPPING SLAB OK TO PLACE @ NORTH-EAST QUADRANT OF GARAGE
04/23/2010 BUILDING PRE-SLAB Partial Approval S.O.G. B-3 LEVEL WHERE CRANE SAT.
04/06/2010 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
LIGHT POLE BASE NORTHEAST CORNER
02/16/2010 BUILDING PRE-SLAB Partial Approval OK TO PLACE CONCRETE AT STAIR #3
02/04/2010 BUILDING PRE-SLAB Partial Approval ELECTRICAL CONDUIT CHASE ENCASEMENT @ LEVEL B1 BY EQUIP ROOM OK TO COVER.
01/14/2010 BUILDING PRE-SLAB Not ready for Inspection IVRS - Inspection :*
01/07/2010 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
1) STAIRWELL TREAD AND LANDINGS SOUTH EAST CORNER
12/14/2009 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
CWR WORK ON B1
11/18/2009 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
1) LIGHT POLE BASE SOUTH EAST CORNER
11/17/2009 BUILDING PRE-SLAB Partial Approval 1 BAY BAR PEDESTAL AT EAST SIDE SOUTH CORNER
11/12/2009 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
1) ELEVATOR P.T. DECK 1 & 2
11/09/2009 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
1) STEM SOUTH SIDE OK
11/06/2009 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
1) CURBS IN GARAGE OK
10/29/2009 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
1) COMPLETION OF STRUCTURAL SLABS INCLUDING RAMPS OK
10/22/2009 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
1) NORTH EAST QUAD AT LEVEL B/O OK
2) KNOCKOUT PANEL OK AT H8
10/19/2009 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
1) BOTTOM MAT GL E.8/A-6.2-10
10/14/2009 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
1) OK SOUTHEAST QUAD OF 80'
10/13/2009 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
1) SE QUAD AND RAMP LEVEL B-0
2) SIDE: FORM LOOSE AT RAMP, ANGLES COMING OUT OF COLUMN AT 47 NOT SPLAYED INTO SLAB RFI
10/09/2009 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
1) NORTH 1/2 MLK FOUNDATION
10/07/2009 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
1) LEVEL BO NORTH 1/2 MAT AND BEAMS
2) A FEW CLEARANCE ISSUES BEING CORRECTED
3) NEED TO TALK TO SCHNEIDER ABOUT #11 BY PIPES AND CLEAR SPACE
09/24/2009 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
09/23/2009 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
1) CURBING LEVEL 1 GOING TO S.W. CORNER OK
09/21/2009 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
1) GL 3-5/E.6-K B.0 DECK
09/17/2009 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
LOW SLAB (STREET LEVEL) NW GUARD OK TO PLACE
09/15/2009 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
1) BOTTOM MATT NORTH WEST QUAD TO LINE 4 LEVEL STREET OK
2) PROGRESS DONE 4-6 ENGINEERING; NEED TO RECHECK ALL BEAMS
3) TOP LEVEL (FOUNDATION) OF MLK TOWER PROGRESS OK; RECHECK FOR CENTER BEAM AT PENETRATIONS AND CHECK BOLTING AT SHEAR (4.F & H)
09/14/2009 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
09/10/2009 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
1) EQUIPPED LEVEL B1/A-7 AREA OK
09/04/2009 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
1) PLACEMENT OF NORTH EAST OF B-1 OK
2) PROGRESS ON UPPER LEVEL OK
09/02/2009 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
1) JAMB STEEL REQUIRED AT MECH 103 DOOR OPENING
2) PULL VERTICAL CONDUIT AWAY FROM COL. STEEL (2 LOCATION)
3) LEVEL B1 NORTH EAST QUADRANT SLAB STEEL OK
08/31/2009 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
1) OK TO PLACE LOWER SLAB AREA E-N/1-6.2
08/28/2009 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
1) PROGRESS AT STREET LEVEL TOP MAT OK
2) I WANT ENGINEERING OF RECORD TO PHYSICALLY VISIT SITE MONDAY TO VERIFY CONDUITS ETC... OK STRUCTUALLY
08/24/2009 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
1) BOTTOM MATT AND BEAMS STREET LEVEL DROP #9 STEEL UNDER #12 TO ALLOW FOR CONCRETE ENCASEMENT AT BEAMS (AREA E-?/1-6.2
08/14/2009 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
1) EQUP PAD AT 104-OK
08/03/2009 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
1) OK TO PLACE LEVEL B1 AT E-N/6-10
07/30/2009 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
B1@B-10/E18-N/ TOP & BOTTOM MINUS VENTS & SOME FINAL TIES
07/28/2009 BUILDING PRE-SLAB Partial Approval 1) PRE-SLAB POURED BEFORE ARRIVAL PER SUPER SPECIAL INSPECTED
2) MECH PAD IN ROOM 203
07/23/2009 BUILDING PRE-SLAB Partial Approval LEVEL B-2 S.O.G. COMPLETE; LEVEL B1 TO GROUND RAMP TO LINE 7.1-OK
07/22/2009 BUILDING PRE-SLAB Cancelled IVRS - RI canceled
07/22/2009 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
1) COMPACTION RESULTS ACCEPTED LEVEL B2 (REMAINING AREA) STILL NEED WIRE MESH-ALL ELSE OK
07/17/2009 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
1) SLAB LEVEL B1 OK 1-6.5/A-F
07/16/2009 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
1) LEVEL B1 BOTTOM MATT, COL CAPS AND BEAMS-OK TO LINE 6.2
2) SUMP PIT PLACEMENT-OK
07/13/2009 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
1) LEVEL B2 SUMP PIT AND WALL FOOTINGS OK LINE B 7-8
2) BOTTOM MATT; COL. CAPS AND BEAMS A-F/1-3.8:
A) CHECK BOTTOM MATT STEEL NEAR COLS FOR 3/4" CLEARANCE
B) NEED ENGINEER RFI FOR #11 BENT BARS AT E/2
06/30/2009 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
1) OK TO PLACE 1-6.5/E.8-N1 LEVEL B1 (FLOOR DRAINS OK ALSO)
06/26/2009 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
1) LEVEL B1 1-6.5./E.8-N READY, SOME MINOR CLEARANCE ISSUES WITH CONDUIT REMAIN
06/24/2009 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
E.8-N/1-6.5 BOTTOM MATTS OK
BEAMS OK
LOWER COL. CAP OK
06/19/2009 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
06/18/2009 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
1) BOTTOM MAT AND BEAMS 1-6.5/N-6.5 OK
2) WATCH CLEARANCE AT ELECTRIC OUTLETS
3) KEEP 1" BETWEEN BEAM BARS
06/16/2009 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
109 & 101 S300
1. SLAB ON GRADE 1 TO 4 - A TO D, 4 TO 7 TO A TO G
2. VERIFY MINIMUM LAP FOR DECK POURS
06/15/2009 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
G.L. 1-4-D SHORING ONLY
06/10/2009 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
06/04/2009 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
S.O.G @ N. STAIR AND 1-4/C-G
06/03/2009 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
04/09/2009 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
GRID LINE 4-1/G-N OK
04/07/2009 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
B-1 B-2
03/25/2009 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
G-K/4-10; K-N/8.5-10; MECH. PAD 1-2/K-N OK
03/16/2009 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
J-K/4-8 OK TO PLACE