Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING PRE-SLAB
Permit Number - T07CM03033
Inspection Description - BUILDING PRE-SLAB
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/07/2010 | BUILDING PRE-SLAB | Approved | IVRS - Inspection :* | |
05/03/2010 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection :* | |
04/30/2010 | BUILDING PRE-SLAB | Partial Approval | DRAINAGE PROTECTION OK AND TOPPING SLAB OK TO PLACE @ NORTH-EAST QUADRANT OF GARAGE | |
04/23/2010 | BUILDING PRE-SLAB | Partial Approval | S.O.G. B-3 LEVEL WHERE CRANE SAT. | |
04/06/2010 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection :* LIGHT POLE BASE NORTHEAST CORNER |
|
02/16/2010 | BUILDING PRE-SLAB | Partial Approval | OK TO PLACE CONCRETE AT STAIR #3 | |
02/04/2010 | BUILDING PRE-SLAB | Partial Approval | ELECTRICAL CONDUIT CHASE ENCASEMENT @ LEVEL B1 BY EQUIP ROOM OK TO COVER. | |
01/14/2010 | BUILDING PRE-SLAB | Not ready for Inspection | IVRS - Inspection :* | |
01/07/2010 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection :* 1) STAIRWELL TREAD AND LANDINGS SOUTH EAST CORNER |
|
12/14/2009 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection :* CWR WORK ON B1 |
|
11/18/2009 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection :* 1) LIGHT POLE BASE SOUTH EAST CORNER |
|
11/17/2009 | BUILDING PRE-SLAB | Partial Approval | 1 BAY BAR PEDESTAL AT EAST SIDE SOUTH CORNER | |
11/12/2009 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection :* 1) ELEVATOR P.T. DECK 1 & 2 |
|
11/09/2009 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection :* 1) STEM SOUTH SIDE OK |
|
11/06/2009 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection :* 1) CURBS IN GARAGE OK |
|
10/29/2009 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection :* 1) COMPLETION OF STRUCTURAL SLABS INCLUDING RAMPS OK |
|
10/22/2009 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection :* 1) NORTH EAST QUAD AT LEVEL B/O OK 2) KNOCKOUT PANEL OK AT H8 |
|
10/19/2009 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection :* 1) BOTTOM MAT GL E.8/A-6.2-10 |
|
10/14/2009 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection :* 1) OK SOUTHEAST QUAD OF 80' |
|
10/13/2009 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection :* 1) SE QUAD AND RAMP LEVEL B-0 2) SIDE: FORM LOOSE AT RAMP, ANGLES COMING OUT OF COLUMN AT 47 NOT SPLAYED INTO SLAB RFI |
|
10/09/2009 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection :* 1) NORTH 1/2 MLK FOUNDATION |
|
10/07/2009 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection :* 1) LEVEL BO NORTH 1/2 MAT AND BEAMS 2) A FEW CLEARANCE ISSUES BEING CORRECTED 3) NEED TO TALK TO SCHNEIDER ABOUT #11 BY PIPES AND CLEAR SPACE |
|
09/24/2009 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection :* | |
09/23/2009 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection :* 1) CURBING LEVEL 1 GOING TO S.W. CORNER OK |
|
09/21/2009 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection :* 1) GL 3-5/E.6-K B.0 DECK |
|
09/17/2009 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection :* LOW SLAB (STREET LEVEL) NW GUARD OK TO PLACE |
|
09/15/2009 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection :* 1) BOTTOM MATT NORTH WEST QUAD TO LINE 4 LEVEL STREET OK 2) PROGRESS DONE 4-6 ENGINEERING; NEED TO RECHECK ALL BEAMS 3) TOP LEVEL (FOUNDATION) OF MLK TOWER PROGRESS OK; RECHECK FOR CENTER BEAM AT PENETRATIONS AND CHECK BOLTING AT SHEAR (4.F & H) |
|
09/14/2009 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection :* | |
09/10/2009 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection :* 1) EQUIPPED LEVEL B1/A-7 AREA OK |
|
09/04/2009 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection :* 1) PLACEMENT OF NORTH EAST OF B-1 OK 2) PROGRESS ON UPPER LEVEL OK |
|
09/02/2009 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection :* 1) JAMB STEEL REQUIRED AT MECH 103 DOOR OPENING 2) PULL VERTICAL CONDUIT AWAY FROM COL. STEEL (2 LOCATION) 3) LEVEL B1 NORTH EAST QUADRANT SLAB STEEL OK |
|
08/31/2009 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection :* 1) OK TO PLACE LOWER SLAB AREA E-N/1-6.2 |
|
08/28/2009 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection :* 1) PROGRESS AT STREET LEVEL TOP MAT OK 2) I WANT ENGINEERING OF RECORD TO PHYSICALLY VISIT SITE MONDAY TO VERIFY CONDUITS ETC... OK STRUCTUALLY |
|
08/24/2009 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection :* 1) BOTTOM MATT AND BEAMS STREET LEVEL DROP #9 STEEL UNDER #12 TO ALLOW FOR CONCRETE ENCASEMENT AT BEAMS (AREA E-?/1-6.2 |
|
08/14/2009 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection :* 1) EQUP PAD AT 104-OK |
|
08/03/2009 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection :* 1) OK TO PLACE LEVEL B1 AT E-N/6-10 |
|
07/30/2009 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection :* B1@B-10/E18-N/ TOP & BOTTOM MINUS VENTS & SOME FINAL TIES |
|
07/28/2009 | BUILDING PRE-SLAB | Partial Approval | 1) PRE-SLAB POURED BEFORE ARRIVAL PER SUPER SPECIAL INSPECTED 2) MECH PAD IN ROOM 203 |
|
07/23/2009 | BUILDING PRE-SLAB | Partial Approval | LEVEL B-2 S.O.G. COMPLETE; LEVEL B1 TO GROUND RAMP TO LINE 7.1-OK | |
07/22/2009 | BUILDING PRE-SLAB | Cancelled | IVRS - RI canceled | |
07/22/2009 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection :* 1) COMPACTION RESULTS ACCEPTED LEVEL B2 (REMAINING AREA) STILL NEED WIRE MESH-ALL ELSE OK |
|
07/17/2009 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection :* 1) SLAB LEVEL B1 OK 1-6.5/A-F |
|
07/16/2009 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection :* 1) LEVEL B1 BOTTOM MATT, COL CAPS AND BEAMS-OK TO LINE 6.2 2) SUMP PIT PLACEMENT-OK |
|
07/13/2009 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection :* 1) LEVEL B2 SUMP PIT AND WALL FOOTINGS OK LINE B 7-8 2) BOTTOM MATT; COL. CAPS AND BEAMS A-F/1-3.8: A) CHECK BOTTOM MATT STEEL NEAR COLS FOR 3/4" CLEARANCE B) NEED ENGINEER RFI FOR #11 BENT BARS AT E/2 |
|
06/30/2009 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection :* 1) OK TO PLACE 1-6.5/E.8-N1 LEVEL B1 (FLOOR DRAINS OK ALSO) |
|
06/26/2009 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection :* 1) LEVEL B1 1-6.5./E.8-N READY, SOME MINOR CLEARANCE ISSUES WITH CONDUIT REMAIN |
|
06/24/2009 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection :* E.8-N/1-6.5 BOTTOM MATTS OK BEAMS OK LOWER COL. CAP OK |
|
06/19/2009 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection :* | |
06/18/2009 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection :* 1) BOTTOM MAT AND BEAMS 1-6.5/N-6.5 OK 2) WATCH CLEARANCE AT ELECTRIC OUTLETS 3) KEEP 1" BETWEEN BEAM BARS |
|
06/16/2009 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection :* 109 & 101 S300 1. SLAB ON GRADE 1 TO 4 - A TO D, 4 TO 7 TO A TO G 2. VERIFY MINIMUM LAP FOR DECK POURS |
|
06/15/2009 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection :* G.L. 1-4-D SHORING ONLY |
|
06/10/2009 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection :* | |
06/04/2009 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection :* S.O.G @ N. STAIR AND 1-4/C-G |
|
06/03/2009 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection :* | |
04/09/2009 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection :* GRID LINE 4-1/G-N OK |
|
04/07/2009 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection :* B-1 B-2 |
|
03/25/2009 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection :* G-K/4-10; K-N/8.5-10; MECH. PAD 1-2/K-N OK |
|
03/16/2009 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection :* J-K/4-8 OK TO PLACE |