Inspection History Details
Inspection Status: Approved
Inspection History: FRAMING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/08/2008 | FRAMING | Approved | IVRS - Inspection :* OK TO SHEETROCK PENDING ELECTRIC & PLUMBING INTERMEDIATES |
|
| 03/27/2008 | FRAMING | Not ready for Inspection | IVRS - Inspection :* A STAMPED RFI FROM THE ARCHITECT IS REQUIRED FOR THE FOLLOWING CHANGES: 1. OFFICE #4 SOUTH WALL; A DOOR & SIDE LIGHT HAVE BEEN INSTALLED IN PLACE OF A WINDOW 2. A PASSAGE DOOR BETWEEN OFFICES #3 & #4 HAS BEEN FRAMED THESE CHANGES MUST BE APPROVED BY THE ARCHITECT |