Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/19/2008 | ENGINEERING - FINAL | Approved | Contractor addressed punch list. | |
| 06/17/2008 | ENGINEERING - FINAL | Denied | Contractor needs to: 1- Complete all work outside of building. 2- Fill all open holes around building. 3- Complete all hand rail work around building. 4- Clean all construction debris from site. 5- Remove dumpster and port-a-potty from site. |
|
| 05/13/2008 | ENGINEERING - FINAL | Not ready for Inspection | Met with Larry on site to look at sidewalk placement. All sidewalks around perimeter are in right-of-way. Larry will needs to contact T.D.O.T inspector. |