Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/16/2008 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 05/14/2008 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* - CORRECT LEAKS ON SINKS AND WC - PROVIDE A CLEAN BACTERIA REPORT SEE SPEC. 3.04 - PROVIDE APPROVAL OF FIXTURE SPECIFICATION CHANGES - REMOVE GALVANIZED FITTINGS AT FIXTURE CONNECTIONS SEE SPEC. 2.04A FOR APPROVED MATERIAL TYPES - REMOVE EXCESS FLUX AT SOLDIER JOINTS (HAMMER ARRESTOR) - CORRECT SPLASHING AT FS - INSTALL DRAINAGE FITTINGS ON VENT BELOW FLOOD LEVEL OF 3-COMP SINK - ONLY ONE P-TRAP ALLOWED ON TRAP ARM, P-TRAP SHALL BE THE SAME SIZE AS TRAP ARM |