Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/29/2009 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* | |
| 09/19/2008 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* PER REDLINE OF 8 1/2 X 11 FROM PAUL DOMINGUEZ ENGINEER ON SITE P-5 DOES NOT EXIST AT P1.0 LOCATION AND IS BEING ADDED TO THIS PROJECT. THIS REQUIRES REVISION WITH CITY OF TUCSON APPROVAL OF PLAN. WATER TEST IS OK FOR UNDERGROUND. PER INITIAL ON THIS 8 1/2 X 11 |