Permit: T07CM02959

Parcel: 11105063G

Inspection Status: Approved

Inspection History: EXCAVATION/LAYOUT REBAR & ZON

Date Description Inspector Results Comments
09/29/2008 EXCAVATION/LAYOUT REBAR & ZON Approved IVRS - Inspection :*
LINE B/2.3-2.4
PIER FOOTING (F8) DETAIL #8 PAGE S3
TOE DOWN FOOTINGS (EAST SIDE) -- OK TO POUR
09/18/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
CONTINUOUS FOOTING DETAIL #10 PAGE S3 LINE G/1 TO B/5
3 @ F4/C2, 10 @ F2/C2 -- OK TO POUR PROGRESS AREAS
09/16/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
1 @ COLUMN FOOTING F1/C5 @ C/3.4; 1 @ COLUMN FOOTING F1/C5 @ C.2/2.6 - 2 @ COLUMN FOOTINGS @ F/3-3.3
OK TO POUR PROGRESS AREA
09/08/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
1. 8 @ F1 COLUMN FOOTINGS @ EXISTING BUILDING
(COLUMN @ 3/F.1 MISSING)
2. 3 @ F/4 COLUMN FOOTINGS @ ELEVATOR PIT
3. ELEVATOR PIT @ 40"

OK TO POUR PROGRESS AREA
08/28/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
ELEVATOR PIT FOOTINGS @ B/3.5 TO B.1/4.1
2 @ COLUMN FOOTING C1/F5 @ LINE 2/D-E
1 @ COLUMN FOOTING C1/F4 @ LINE E/2.3
1 @ COLUMN FOOTING C1/F7 @ LINE D/3.3
1 @ COLUMN FOOTING C1/F5 @ LINE D/4.3

OK TO POUR PROGRESS AREAS
ELEVATOR PIT CHANGE FOR COLUMNS DATED 8/25/08