Permit: T07CM02906

Parcel: 14108534A

Inspection Status: Approved

Inspection History: ENGINEERING - FINAL

Permit Number - T07CM02906

Inspection Description - ENGINEERING - FINAL

Inspection Status - Approved

Date Description Inspector Results Comments
03/12/2008 ENGINEERING - FINAL Approved ALL CLASS 1 BIKE PARKING INSTALLED
03/04/2008 ENGINEERING - FINAL Partial Approval ALL CLASS 2 BIKE PARKING INSTALLED
MISSING 6 CLASS 1 BIKE PARKING
ALL OTHER SITE WORK IS CP
ROOF DRAINS ACROSS SIDEWALK-EXISTING NO CHANGE ON PLANS
11/26/2007 ENGINEERING - FINAL Partial Approval TEMPORARY C OF O APPROVAL AT THIS TIME, FINAL NOT TO BE GIVEN UNTIL ALL OF THE WORK HAS BEEN COMPLETED ON THE EXTERIOR PARKING LOT. IT WAS NOTED DURING THE SITE VISIT THAT THE REQUIRED BICYCLE RACK HAS NOT YET BEEN INSTALLED, AND THAT AN EXISTING HANDICAP PARKING SPOT REMAINS IN AN AREA THAT IS NOT ACCESSABLE. THE DEVELOPER WILL HAVE THESE ISSUES CORRECTED BEFORE HE SCHEDULES A FINAL INSPECTION.
11/09/2007 ENGINEERING - FINAL Not ready for Inspection ASPHALT PATCH HAS BEEN COMPLETED

PORTA TOILET STILL ON SITE
MOBILE MINI STILL ON SITE
DUMPSTER STILL ON SITE


BIKE PARKING IS TO BE LOCATED INSIDE BUILDING
10/29/2007 ENGINEERING - FINAL Not ready for Inspection DUMPSTER STILL ON SITE
PORTA TOILET STILL ON SITE
MOBILE MINI STILL ON SITE
ASPHALT PATCH NOT COMPLETE
WASHOUT IN PARKING AREA (EAST SIDE OF BLDG)

BIKE PARKING IS TO BE ADDRESSED WITH ARCHITECT FOR PLACEMENT- TO BE REVIEWED BY ZONING

REVIEW DONE BY WILDAN