Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/16/2008 | ENGINEERING - FINAL | Approved | ALL PREVIOUS NOTED ITEMS COMPLETE | |
| 07/10/2008 | ENGINEERING - FINAL | Denied | Contractor needs to: 1- Install HC ramp on northeast side of building. 2- Complete all striping. 3- Install HC parking per approved drawing. 4- Install all wheel stops per approved drawing. 5- Install loading zone per approved drawing. 6- Install wheel stops east side of building. (2'6") Sidewalk less then 6'6". |