| 09/05/2008 | ENGINEERING - FINAL | Approved | ||
| 06/13/2008 | ENGINEERING - FINAL | Denied | DRAWING SHOWING CHANGES MADE TO HC ACCESS RAMP ALONG SE CORNER OF BLDG LOOKS OK AND APPROVAL STAMPS ARE IN PLACE - CALL FOR RE-INSPECTION WHEN COMPLETED. | |
| 04/21/2008 | ENGINEERING - FINAL | Denied | SEE 2/21/08 INSPECTION | |
| 04/16/2008 | ENGINEERING - FINAL | Denied | NO APPROVED PLANS ON SITE, NO CONTACT ON SITE CALL FOR RE-INSPECTION |
|
| 02/21/2008 | ENGINEERING - FINAL | Correction Required | MET WITH SITE SUPERINTENDENT TO DISCUSS ADA COMPLIANT ACCESS TO BLDG. A PROPOSED REVISION TO APPROVED SITE PLAN WILL BE SENT TO ME TO BE REVIEWED BY ZONING FOR APPROVAL PRIOR TO ACCEPTANCE. |
|
| 02/06/2008 | ENGINEERING - FINAL | Denied | MEETING WITH TRIUMPH REGARDING THE SIDEWALK TO HANDICAP CONNECTION AT THE SOUTHEAST CORNER OF THE PROJECT. THE ENGINEER WILL DRAW UP THE REVISIONS AND MEET WITH MIKE RUSSO PRIOR TO CONSTRUCTION. |