Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/24/2008 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 09/22/2008 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. WHO LOOKED AT RAIN DRAIN EXTENSIONS FROM BLDG. TO CURB? 2. WHO LOOKED AT YARDWATER PIPING? 3. WHERE IS YOUR SITE UTILITY PLAN? 4. CONTINUED "NOT READY" WILL RESULT IN REINSPECTION FEE |
|
| 09/05/2008 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. PROVIDE RAIN DRAIN TERMINATIONS 2. PROVIDE VACUUM BREAKER AT HOSE BIB 3. PROVIDE CORRECT TERMINATION OF ALL CLEANOUTS MADE GAS TIGHT. PLEASE REMOVE COVERS TO FLOOR CLEANOUT TO VERIFY THIS AT ALL LOCATIONS INTERIOR & EXTERIOR 4. ALL FLOOR CLEANOUTS TO BE FRANK PATTER 5. PROVIDE CAPS ON ALL FUTURE WATER STUBS PER PLAN |