Permit: T07CM02890

Parcel: 11604120A

Inspection Status: Approved

Inspection History: PLUMBING - FINAL

Date Description Inspector Results Comments
09/17/2009 PLUMBING - FINAL Approved IVRS - Inspection :*
08/17/2009 PLUMBING - FINAL Not ready for Inspection IVRS - Inspection :*
1) PROVIDE ALL REVISED DRAWINGS. ANY ENGINEERING CHANGES REQUIRES REVIEW BY STANTEC
2) PROVIDE CLEAN BACTERIA REPORT AND METHOD OF SERILIZATION
3) REQUIRE 12" CLEARANCE IN FRONT OF 2" CLEANOUT AT BREAKROOM SINK
4) KINK CONDENSATE DRAIN AT LAV NOT APPROVED
5) PROVIDE CERTIFICATION OF RPPBP
11/06/2008 PLUMBING - FINAL Not ready for Inspection IVRS - Inspection :*
1. THERE ARE EXISTING PLUMBING FACILITIES
2. PLUMBING FACILITIES UNDER T.I ARE NON-OPERATIONAL
3. CONTRACTOR REQUESTING TEMP C OF O APPROVAL SUBJECT TO BUILDING OFFICIAL
10/31/2008 PLUMBING - FINAL Not ready for Inspection IVRS - Inspection :*
1. PLEASE CALL IN AND HAVE APPROVED ALL REQUIRED INSPECTIONS PRIOR TO CALLING FINAL
2. CONTINUED "NOT READY" MAY RESULT IN A
REINSPECTION FEE
10/22/2008 PLUMBING - FINAL Not ready for Inspection IVRS - Inspection :*
THIS RENOVATION HAS NO SEWER OR HCS CONNECTION
ALSO, NO WATER IS ON AS THERE IS NO SEWER TO DISCHARGE INTO