Permit: T07CM02804

Parcel: 11460041A

Inspection Status: Approved

Inspection History: ENGINEERING - FINAL

Date Description Inspector Results Comments
01/02/2008 ENGINEERING - FINAL Approved
12/07/2007 ENGINEERING - FINAL Partial Approval COMPLETE ALL ITEMS AS PREVIOUSLY NOTED ON THE INSPECTION NOTES FOE 12/04/07.
12/07/2007 ENGINEERING - FINAL Partial Approval VERIFIED ITEMS REQUESTED HAVE BEEN RECEIVED BY THIS DEPARTMENT.
12/06/2007 ENGINEERING - FINAL Partial Approval OK FOR TEMPORARY C OF O.
VENTURE WEST HAS PROVIDED DOCUMENTATION AND A SCHEDULE FOR THE INSTALLATION OF BICYCLE PARKING AT THIS PROJECT.

SEE PREVIOUS COMMENTS WHICH MUST BE ADDRESSED BEFORE A PERMANENT C OF O WILL BE APPROVED.
12/04/2007 ENGINEERING - FINAL Denied BICYCLE PARKING HAS NOT BEEN PROVIDED TO THE APPROVED GRADING AND DEVELOPMENT PLANS, NOR HAS IT BEEN PROVIDED PER THE RECENT (PARTIAL) AS-BUILT PLANS OR (2) CONCEPTUAL BIKE PARKING PLANS.

INSPECTION CAN NOT BE COMPLETED UNTIL VENTURE WEST PROVIDES DOCUMENTATION, PHOTOS AND A FIRM ESTABLISHED SHCEDULE FOR INSTALLATION OF BICYCLE PARKIING.

PUNCH LIST:
1. PROVIDE BICYCLE PARKING AND AN APPROVED PLAN.
2. REPAIR CHIPPED CURBS AND SIDEWALK.
3. MODIFY ROOF CANALES TO PREVENT ROOF DRAINAGE ONTO SIDEWALKS.
4. PROVIDE 6" REVEAL CURB AT LANDSCAPE SIDE OF H/C RAMP.