Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: EXT METAL CLIPS/EXT SHEATHING
Permit Number - T07CM02787
Inspection Description - EXT METAL CLIPS/EXT SHEATHING
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/28/2007 | EXT METAL CLIPS/EXT SHEATHING | Approved | IVRS - Inspection :* | |
| 11/20/2007 | EXT METAL CLIPS/EXT SHEATHING | Not ready for Inspection | IVRS - Inspection :* | |
| 11/16/2007 | EXT METAL CLIPS/EXT SHEATHING | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) NEED TO FOLLOW ALL SHEAR/HOLDOWNS SCHEDULES PER PLANS 2) FOLLOW ALL APPROVED PLANS PER DETAILS 3) WARNING A REFEE WILL APPLY IF NOT READY AT NEXT INSPECTION |
|
| 10/25/2007 | EXT METAL CLIPS/EXT SHEATHING | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) MISSING SCREWS AT EDGES ON DECK 2) NEED REVISIONS ON CHANGES WITH CITY APPROVALS |
|
| 10/10/2007 | EXT METAL CLIPS/EXT SHEATHING | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. TIGHTEN NUTS ON H/D'S MARKED ON FLOOR 2. NAIL OFF SHEAR WALLS PER PLANS AS MARKED IN BLACK CRAYON 3. H/D 7 REQUIRES 22-10d NAILS EACH STRAP W/2 STRAP INTO 2 - 2X 4. NEED WIND BRACING 2ND FLOOR EAST END 5. H/D 6 REQUIRES 1 CS WITH 22-10d NAILS 6. COVERED DECK ROOFING ELEVATION 1 NOT 2 7. NEED ADDITIONAL FRAMING AT AC UNIT AREA - 4' X 7' AREA WITH NO SUPPORT |