Inspection History Details
Inspection Status: Approved
Inspection History: FRAMING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/05/2007 | FRAMING | Approved | IVRS - Inspection :* | |
| 08/31/2007 | FRAMING | Not ready for Inspection | IVRS - Inspection :* 1) NOT READY PER HORACE |
|
| 08/30/2007 | FRAMING | Denied | IVRS - Inspection : Work is not complete enough to inspect.| 950* 1) DWV STACK REQUIRES CLEANOUT POWDER ROOM 2) KITCHEN SINK MUST VENT TO ROOF-SEE PLAN 3) NAIL 2ND FLOOR SILL PLATES AT 16" ON CENTER 4) HALL BATH DIRTY ARM EXCEEDS 42" 5) FIRESTOP REQUIRES 2 LAYERS 1/2" OSB 6) ANCHOR BOLT REQUIRED WITHIN 12" OF PLATE END STAIR 7) GIRDER TRUSS REQUIRES POST TO ?040 8) FIRE STOP FLOOR PENETRATIONS 9) STOPPED INSPECTION-TOO MANY ITEMS |
|
| 08/23/2007 | FRAMING | Denied | IVRS - Inspection : Work is not complete enough to inspect.| 950* 1. ELECTRIC BOXES LATHED OVER 2. LATH NOT COMPLETE 3. OUTSIDE HOSE BIB REQUIRE ANTI-SIPHON VALVE 4. FIREBLOCK REQUIRES 2 LAYERS 1/2" OSB 5. NO PLANS ON SITE 6. 4 SWITCH ELECTRICAL BOX REQUIRES SUPPORT 2 ENDS 7. FIRE STOP 2ND FLOOR PENETRATIONS 8. 2ND FLOOR STACK REQUIRES CLEANOUT STOPPED INSP. TO MANY ITEMS |