Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/17/2008 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* FROM 2-WAY CLEANOUT WITH BACKWATER VALVE THRU BLD. UNDERGROUND WATER TEST OK 1. AT FUTURE INSPECTION PROOF WILL BE REQUIRED FOR NEED OF BACKWATER VALVE INSTALL NOT SHOWN ON APPROVED PLAN OR IT MAY BE REQUIRED TO BE REMOVED. FOR FUTURE INSPECTION POST A BUILDING SITE ADDRESS |