Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/17/2007 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
| 07/13/2007 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* BOILER SHALL REQUIRE STATE BOILER INSPECTION FOR FINAL 1. SHALL SOLGROGAS PIPING TO L-BRACKERS AT EXTERIOR 2. SHALL SEAL PIPE PENETRATION INTO BUILDING 3. SHALL PROVIDE EMERGENCY GAS SHUT OFF VALVE ON THIS BRANCH OF GAS PIPING 4. PROVIDE COUPLING IN PLACE OF THREAD PROTECTOR 5. GAS PIPING TO BE 2" PER PLAN TO VALVE AT APPLIANCES 6. PRESSURE RELIEF TO BE FULL SIZE GRAVITY DRAIN 7. VENTS FROM REGULATORS TO BE TERMINATED CORRECTLY |