| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/09/2007 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* | |
| 10/08/2007 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* | |
| 10/08/2007 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* 1. THE PLAN STILL DOES NOT HAVE A MATERIAL SCHEDULE NORMALLY, ALL MATERIALS WITHINA BUILDING ARE TO BE TYPICAL UNLESS NOTED OTHERWISE. EXISTING MATERIAL IS PVC MEANING THE TI IS TO BE PVC ALSO UNLESS SPECIFICED BY THE PLAN. I WILL NEED AN APPROVED PLAN SHOWING MATERIAL TYPES FOR PIPING SUPPORTS, INSULATION ETC. 2. 1 1/2" VENT EXCEEDS LIMITATIONS OF TABLE 7-6 2003 UPC 3. CONTINUED "NOT READY" WILL RESULT IN A REINSPECTION FEE |