Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/08/2008 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 01/04/2008 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. SHALL MAKE ALL FIXTURE WATER TIGHT AT FLOOR OR WALL SURFACES 2. TERMINATE EXTERIOR CLEANOUTS PROPERLY 3. PROVIDE WATER HAMMER ARRESTORS FOR HOT & COLD SUPPLY TO WASHING MACHINE 4. PROVIDE MINIMUM 1/4" PER FOOT FALL ON 3-COMP SINK DRAINAGE 5. FLOW CONTROL TO BE INSTALLED WITH VERTICAL VENT TO OPERATE PROPERLY (SWEEP) (LONG RADIUS FITTING) 6. PROVIDE MIXING VALVE FOR NEW RESTROOM LAV SO WATER HEATER IS NOT SOLE CONTROL OF HOT WATER SUPPLY TO LAV NOT TO EXCEED 110 DEG. 7. PROVIDE CORRECT DRAINAGE FOR SINK IN CLASSROOM 8. PROVIDE CORRECT VENT CONNECTIONS FOR WATER HEATER 9. PROVIDE FACTORY TAPPED COUNTER SUNK CLEANOUT PLUGS BEHIND CLEANOUT COVERS WITH MACHINE SCREWS 10. PULL DRINKING FOUNTAIN COVERS FOR INSPECTION. |