Permit: T07CM02651

Parcel: 141113100

Inspection Status: Approved

Inspection History: ELECTRIC - INTERMEDIATE

Permit Number - T07CM02651

Inspection Description - ELECTRIC - INTERMEDIATE

Inspection Status - Approved

Date Description Inspector Results Comments
12/02/2008 ELECTRIC - INTERMEDIATE Approved IVRS - Inspection :*
05/21/2008 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
1) OK TO DRYWALL
2) CALL ELECTRIC INSPECTION ONE MORE TIME FOR DRYWALL AND FINAL
3) BUBBLE COVER EXT. RECEPT
05/14/2008 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
1) AT SUB-PANEL REMOVE GRD SCREW FROM NEUTRAL BAR
2) MOVE ALL GROUND WIRES TO GROUND BUSS, KEEP WHITE WIRES ON ISOLATED NEUTRAL BAR
3) RUN 3 INSULATED WIRES
4) #8=50 AMPS IF THHN IS USED (1" CONDUIT UP TO 8 WIRES)
5) #8=40 AMPS IF ROMEX CABLE USED (ROMEX OK)