Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/02/2008 | ELECTRIC - INTERMEDIATE | Approved | IVRS - Inspection :* | |
| 05/21/2008 | ELECTRIC - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1) OK TO DRYWALL 2) CALL ELECTRIC INSPECTION ONE MORE TIME FOR DRYWALL AND FINAL 3) BUBBLE COVER EXT. RECEPT |
|
| 05/14/2008 | ELECTRIC - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1) AT SUB-PANEL REMOVE GRD SCREW FROM NEUTRAL BAR 2) MOVE ALL GROUND WIRES TO GROUND BUSS, KEEP WHITE WIRES ON ISOLATED NEUTRAL BAR 3) RUN 3 INSULATED WIRES 4) #8=50 AMPS IF THHN IS USED (1" CONDUIT UP TO 8 WIRES) 5) #8=40 AMPS IF ROMEX CABLE USED (ROMEX OK) |