Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/11/2008 | ENGINEERING - FINAL | Approved | Repair erosion at FD inspection ports east and south side of building and fill hole in channel between lots. Item 10 from punch list signed off by TDOT. | |
| 05/29/2008 | ENGINEERING - FINAL | Denied | THIS IS NOT A COMPLETE PUNCH LIST. TO MANY ITEMS TO LIST. Contractor needs to: 1- Separate all construction activity and debris from public access. 2- Remove trash dumpster from site. 3- Remove port-a-apotty from site. 4- Clean all wash out from around site. 5- Complete all work around outside of building. 6- Install doors for trash enclosure. 7- Close out grading permit. 8- Address erosion in drainage channel, southside of project. 9- Remove all stock piled material from site. 10- Remove temp fencing from site. 11- Provide letter from engineer per COT drainage manual chapter XIV, section 14.2 (7). Cert for site. Spoke to site super in regards to punch list. |
|
| 11/19/2007 | ENGINEERING - FINAL | Denied | Contractor needs to call in when all work is complete. |