Inspection History Details
Inspection Status: Approved
Inspection History: REINFORCED MASONRY PRE-GROUT
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/28/2008 | REINFORCED MASONRY PRE-GROUT | Approved | IVRS - Inspection :* | |
| 04/22/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1. PROVIDE GLASS BLOCK DETAILS 2. OK TO TOP OUT & GROUT DUMPSTER ENCLOSURE REBAR @ PAD OK, WIRE AT ALL OF DRIVE APRON OK |
|
| 04/16/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 3 NORTH LIGHT BASES & TRASH ENCLOSURE OK TO POUR FOOTINGS |
|
| 04/03/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* OK TO POUR EXTERIOR MEZZANINE DECK COVER HOLES ON INTERIOR DECK |
|
| 03/20/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* SECOND FLOOR STORAGE DECK SLAB |
|
| 03/19/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* CMU TOP OUT @ ELEVATOR SHAFT WALLS - OK TO GROUT |
|
| 03/17/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* NORTH ENTRY ALCOVE TOP OUT CAST IN PLACE BEAM OK TO POUR |
|
| 03/14/2008 | REINFORCED MASONRY PRE-GROUT | Denied | IVRS - Inspection : See detailed listing on site.| 999* CLEARANCE FOR RADIUS OUT PAST BLOCK |
|
| 03/11/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 2ND LIFT AT ELEVATORS EQUIPMENT ROOM OK TO GROUT |
|
| 03/07/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection : ELEVATOR & EQUIPMENT ROOM 1ST LIFT ABOVE MEZZANINE |
|
| 03/05/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* OK TO POUR MIDDLE TIE BEAM ABOVE GLASS BLK OPENING NEED RFI FOR DIFFERENCE BETWEEN TOP AND BOTTOM TIE BEAMS 2/S9 |
|
| 02/20/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* OK TO POUR BOND BEAM 3 TO 2 AT MATCH LINE |
|
| 02/14/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* E TO F LINE 2 AND 3 OK TO POUR BOND BEAM E - 2 TO 3 E.5 2 TO 3 6W 3.5 TO T |
|
| 02/12/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 2ND LIFT ON OVERHEAD WING WALL OK TO POUR 1ST TIE BEAM RADIUS ENTRY WALL 2-5.9 |
|
| 02/11/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* OK TO POUR W/RADIUS ENTRY WALL WITH ENGINEERED STAMPED RFI #45 VS 5 AT TIE BEAM |
|
| 02/08/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* E - 2 TO 3 2ND LIFT AND 3 PERPENDICULAR WALLS SOUTH MENS & WOMENS AND STORAGE OK TO POUR TY BEAM |
|
| 02/07/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 2 F TO H 3 F TO H E.5 2 TO 3 OK TO GROUT F 2 TO 3 H 2 TO 3 OK TO POUR BOND BEAM |
|
| 02/06/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* NEED RFI ALUM VS. STEEL LENTELS E 1 TO 2 2 TO E TO F 3 E TO F EXCEPT LINTEL AREA |
|
| 02/04/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1) RESTROOMS AND OFFICE AREA 1ST LIFT, EXTERIOR WALLS 308, 307 STORAGE 2ND LIFT |
|
| 02/01/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* OK TO POUR BOND BEAM AT KITCHEN BREAK ROOM AND MECHANICAL & ELEVATOR AREAS |
|
| 01/31/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* OK TO GROUT 2ND LIFT 3 - H TO F E - 1 TO 2 FIRST LIFT |
|
| 01/28/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1ST LIFT RM 307, 308 AND STORAGE 2ND LIFT 4 AW TO BW AW - 5 TO 4 BW - 5 TO 4 |
|
| 01/25/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 2ND LIFT H 2-3 TIE BEAM G-IW/2 IW 1-2 RM 115, 116, 117 OK TO GROUT 2ND LIFT 1ST LIFT N&S BREAKROOM WALLS OK TO GROUT |
|
| 01/23/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* PARTIAL IW 1-2, OK TO GROUT 2ND LIFT IW TO F LINE 2 2-3 F LINE |
|
| 01/18/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 14' TIE BEAM AT LOADING DOCK AREA |
|
| 01/16/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 3RD LIFT VERTS AT 14' DOOR AT LOADING DOCK LOADING DOCK SOUTH 3 BAYS OK TO POUR TIE BEAM |
|
| 01/14/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* OK TO GROUT 2ND LIFT AT LOADING DOCK OK TO POUR TIE BEAM AT EAST SIGNAGE WALL |
|
| 01/10/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* TIE BEAM A-B/1-3 OK 4' INTERIOR PROGRESS OK |
|
| 01/08/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* IW 1-2, F-IW 2 LINE OK TO GROUT 1ST LIFT EXCEPT AT COLUMNS EAST EXTERIOR SIGNAGE WALL OK TO GROUT TO TIE BEAM |
|
| 01/03/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* OK TO GROUT SIGN WALL AND ENTRY WALL TO 2ND LIFT P LINE 5 C TO D OK TO GROUT TO TOP OF MASONRY |
|
| 12/31/2007 | REINFORCED MASONRY PRE-GROUT | Denied | IVRS - Inspection : See detailed listing on site.| 999* LAP SPLICES TOO SHORT |
|
| 12/21/2007 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1) 4' EVERYTHING AT Z'; 4' B-D CLOSURE; 8' INTERIOR STUFF 1-3 |
|
| 12/18/2007 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* COURSE AW 1-2, A.52-3.1 |
|
| 12/14/2007 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* OK TO TOP LINE A WHEN SP. INSP. CONFIRMS |
|
| 12/13/2007 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* ROOF LINE ALONG LINE REQUIRES RFI FROM ENGINEER FOR SHORT LAP INTO MASONRY (AVG. 27"-28") INSTEAD OF 31" |
|
| 12/12/2007 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1ST LIFT @ LINES A-W/1 TO A-W/3 ROOMS #112, 113, 114 - OK TO POUR PROGRESS AREAS @ 4' |
|
| 12/11/2007 | REINFORCED MASONRY PRE-GROUT | Not ready for Inspection | IVRS - Inspection :* NO MASONS PRESENT @ JOB SITE - RAIN |
|
| 12/05/2007 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 8' LINE 5/C-F; 8' LINE F/4-5 22' LINE A 2.1-5 18' LINE A 1-2.1 |
|
| 11/29/2007 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* TIE BEAM TOP OF WALL S AT DOCK OK |
|
| 11/28/2007 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* S OF LOAD DOCK TO TOP TIE BEAM; TIE BEAM @ 8'8" E WALL COMPLETE |
|
| 11/27/2007 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* | |
| 11/21/2007 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1. 20' S OF LOAD DOCK 2. OTHER 8' LIFTS AS SPEC. INSP. CONFIRMS 3. OK TO PLACE TIE BEAM (EAST & SOUTH) |
|
| 11/20/2007 | REINFORCED MASONRY PRE-GROUT | Not ready for Inspection | IVRS - Inspection :* WHERE'S YOUR LADDER |
|
| 11/19/2007 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* TIE BEAM LINE 1/A-3 LINE A/1-5 LINE 5/A-B 1. EXTEND SHORT VERTS 2. FIX CUT TIES OK TO PLACE CONCRETE |
|
| 11/16/2007 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 16' SOUTH OF DOCK (WEST WALL) OK |
|
| 11/15/2007 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 12' LINE A; 12' LINE 5/A-C; 12' LINE 1/A-B; 8' LINE 1/B-F |
|
| 11/09/2007 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 8' LINE A & LINE 5/A-B & LINE 5/H-J & LINE H/4-5 |
|
| 11/07/2007 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 4' LINE A 4' LINE 5/A-C; 5/E-F; 5/H-J 8' LINE J; 8' LINE 1 |
|
| 11/05/2007 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 4' @ LINE 1/A-C & LINE A |
|
| 10/30/2007 | REINFORCED MASONRY PRE-GROUT | Not ready for Inspection | IVRS - Inspection :* |