Date Description Inspector Results Comments
05/28/2008 REINFORCED MASONRY PRE-GROUT Approved IVRS - Inspection :*
04/22/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1. PROVIDE GLASS BLOCK DETAILS
2. OK TO TOP OUT & GROUT DUMPSTER ENCLOSURE
REBAR @ PAD OK, WIRE AT ALL OF DRIVE APRON OK
04/16/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
3 NORTH LIGHT BASES & TRASH ENCLOSURE OK TO POUR FOOTINGS
04/03/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
OK TO POUR EXTERIOR MEZZANINE DECK
COVER HOLES ON INTERIOR DECK
03/20/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
SECOND FLOOR STORAGE DECK SLAB
03/19/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
CMU TOP OUT @ ELEVATOR SHAFT WALLS - OK TO GROUT
03/17/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
NORTH ENTRY ALCOVE TOP OUT CAST IN PLACE BEAM
OK TO POUR
03/14/2008 REINFORCED MASONRY PRE-GROUT Denied IVRS - Inspection :
See detailed listing on site.| 999*
CLEARANCE FOR RADIUS OUT PAST BLOCK
03/11/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
2ND LIFT AT ELEVATORS EQUIPMENT ROOM OK TO GROUT
03/07/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :
ELEVATOR & EQUIPMENT ROOM 1ST LIFT ABOVE MEZZANINE
03/05/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
OK TO POUR MIDDLE TIE BEAM ABOVE GLASS BLK OPENING
NEED RFI FOR DIFFERENCE BETWEEN TOP AND BOTTOM TIE BEAMS 2/S9
02/20/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
OK TO POUR BOND BEAM 3 TO 2 AT MATCH LINE
02/14/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
E TO F LINE 2 AND 3
OK TO POUR BOND BEAM E - 2 TO 3 E.5 2 TO 3
6W 3.5 TO T
02/12/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
2ND LIFT ON OVERHEAD WING WALL
OK TO POUR 1ST TIE BEAM RADIUS ENTRY WALL 2-5.9
02/11/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
OK TO POUR W/RADIUS ENTRY WALL WITH ENGINEERED
STAMPED RFI #45 VS 5 AT TIE BEAM
02/08/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
E - 2 TO 3
2ND LIFT AND 3 PERPENDICULAR WALLS
SOUTH MENS & WOMENS AND STORAGE OK TO POUR
TY BEAM
02/07/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
2 F TO H
3 F TO H
E.5 2 TO 3 OK TO GROUT
F 2 TO 3
H 2 TO 3
OK TO POUR BOND BEAM
02/06/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
NEED RFI ALUM VS. STEEL LENTELS
E 1 TO 2
2 TO E TO F
3 E TO F
EXCEPT LINTEL AREA
02/04/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) RESTROOMS AND OFFICE AREA 1ST LIFT, EXTERIOR WALLS 308, 307 STORAGE 2ND LIFT
02/01/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
OK TO POUR BOND BEAM AT KITCHEN BREAK ROOM AND MECHANICAL & ELEVATOR AREAS
01/31/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
OK TO GROUT 2ND LIFT 3 - H TO F
E - 1 TO 2 FIRST LIFT
01/28/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1ST LIFT RM 307, 308 AND STORAGE
2ND LIFT 4 AW TO BW AW - 5 TO 4 BW - 5 TO 4
01/25/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
2ND LIFT H 2-3 TIE BEAM G-IW/2 IW 1-2
RM 115, 116, 117 OK TO GROUT 2ND LIFT
1ST LIFT N&S BREAKROOM
WALLS OK TO GROUT
01/23/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
PARTIAL IW 1-2, OK TO GROUT 2ND LIFT IW TO F LINE 2

2-3 F LINE
01/18/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
14' TIE BEAM AT LOADING DOCK AREA
01/16/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
3RD LIFT VERTS AT 14' DOOR AT LOADING DOCK
LOADING DOCK SOUTH 3 BAYS OK TO POUR TIE BEAM
01/14/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
OK TO GROUT 2ND LIFT AT LOADING DOCK
OK TO POUR TIE BEAM AT EAST SIGNAGE WALL
01/10/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
TIE BEAM A-B/1-3 OK
4' INTERIOR PROGRESS OK
01/08/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
IW 1-2, F-IW 2 LINE
OK TO GROUT 1ST LIFT EXCEPT AT COLUMNS
EAST EXTERIOR SIGNAGE WALL OK TO GROUT TO TIE BEAM
01/03/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
OK TO GROUT SIGN WALL AND ENTRY WALL TO 2ND LIFT
P LINE 5 C TO D OK TO GROUT TO TOP OF MASONRY
12/31/2007 REINFORCED MASONRY PRE-GROUT Denied IVRS - Inspection :
See detailed listing on site.| 999*
LAP SPLICES TOO SHORT
12/21/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) 4' EVERYTHING AT Z'; 4' B-D CLOSURE; 8' INTERIOR STUFF 1-3
12/18/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
COURSE AW 1-2, A.52-3.1
12/14/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
OK TO TOP LINE A WHEN SP. INSP. CONFIRMS
12/13/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
ROOF LINE ALONG LINE REQUIRES RFI FROM ENGINEER
FOR SHORT LAP INTO MASONRY (AVG. 27"-28") INSTEAD OF 31"
12/12/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1ST LIFT @ LINES A-W/1 TO A-W/3
ROOMS #112, 113, 114 - OK TO POUR PROGRESS AREAS @ 4'
12/11/2007 REINFORCED MASONRY PRE-GROUT Not ready for Inspection IVRS - Inspection :*
NO MASONS PRESENT @ JOB SITE - RAIN
12/05/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
8' LINE 5/C-F; 8' LINE F/4-5
22' LINE A 2.1-5
18' LINE A 1-2.1
11/29/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
TIE BEAM TOP OF WALL S AT DOCK OK
11/28/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
S OF LOAD DOCK TO TOP TIE BEAM; TIE BEAM @ 8'8" E WALL COMPLETE
11/27/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
11/21/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1. 20' S OF LOAD DOCK
2. OTHER 8' LIFTS AS SPEC. INSP. CONFIRMS
3. OK TO PLACE TIE BEAM (EAST & SOUTH)
11/20/2007 REINFORCED MASONRY PRE-GROUT Not ready for Inspection IVRS - Inspection :*
WHERE'S YOUR LADDER
11/19/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
TIE BEAM LINE 1/A-3
LINE A/1-5
LINE 5/A-B

1. EXTEND SHORT VERTS
2. FIX CUT TIES

OK TO PLACE CONCRETE
11/16/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
16' SOUTH OF DOCK (WEST WALL) OK
11/15/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
12' LINE A; 12' LINE 5/A-C; 12' LINE 1/A-B; 8' LINE 1/B-F
11/09/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
8' LINE A & LINE 5/A-B & LINE 5/H-J & LINE H/4-5
11/07/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
4' LINE A
4' LINE 5/A-C; 5/E-F; 5/H-J
8' LINE J; 8' LINE 1
11/05/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
4' @ LINE 1/A-C & LINE A
10/30/2007 REINFORCED MASONRY PRE-GROUT Not ready for Inspection IVRS - Inspection :*