Inspection History Details
Inspection Status: Approved
Inspection History: EXCAVATION/LAYOUT REBAR & ZON
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/29/2008 | EXCAVATION/LAYOUT REBAR & ZON | Approved | IVRS - Inspection :* OK TO POUR FLUSH LOADING DOCK |
|
| 02/27/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* OK TO POUR MEZZANINE AND 4' RECESSED LOADING DOCK SPECIAL INSPECTION |
|
| 02/26/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* OK TO POUR 18" RECESS LOADING DOCK |
|
| 01/30/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 1. CANOPY FOOTINGS 16 EACH PLACE AT OWN RISK WHILE I VERIFY PERMIT 2. SITE WALL AROUND PARKING LOT OK 3. NEED TO SHOW SEPARATE SUBMITTAL 55,444 WHOLESALE 4 EACH 40X60 CANOPY |
|
| 12/18/2007 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 5.2 A-B, A1 5.2-4.1, A1 1-2, 1 A1-A |
|
| 12/13/2007 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* | |
| 12/06/2007 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* TIE BEAMS @ 5/A-B @ 25'4"; LINE 5/D-F @ 25'-4" LINE H/4-5 @ 10'4" -- OK TO GROUT |
|
| 11/29/2007 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* BATHROOM AREA WF48 OK PER STRUCT. ENGINEER |
|
| 11/27/2007 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 1) YOU MAY NOT RUN HORIZONTAL DRAIN PIPE INSIDE FOOTINGS 2) AW-BW EXCEPT PLUMBING AREA OK FOR WF48 FOOTINGS |
|
| 11/19/2007 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* INTERIOR FOOTINGS E-EW/1-3 1. YOU MUST WRAP ABS IN FOOTING 2. MOVE VERTICAL @ DRAIN PIPE NEAR 2.5 LINE E |
|
| 11/16/2007 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* TIE BEAM (BOND BEAM) @ 12' NORTH WALL OK |
|
| 11/14/2007 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* TWO TIE BEAMS @ 5/H TO J & J/3 TO 5 AS PER S5/71 |
|
| 11/08/2007 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* AREA F-J |
|
| 11/05/2007 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 1. NEED NEW PLAN PP52 TO REFLECT PP A2 2. INTERIOR FOOTINGS F-IW/1-2 AND F-H/2-3 |
|
| 11/01/2007 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* ELEVATOR SHAFT FOOTING AS PER SHEET A12/30 |
|
| 10/30/2007 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* ALL MAIN BLD OK (PERIMETER) |
|
| 10/24/2007 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 1. CONTINUOUS FOOTING FROM J-1 G.L TO 5-E AND COL FOOTINGS 2. OK TO PLACE NEXT LEVEL @ WASH WALL LEAVE ENOUGH LAP SPLICE FOR TOP CONNECTIO TO FOOTING OF BUILDING 3. ROCK STEM WALLS OK |
|
| 10/22/2007 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* "FOOTING" @ WASH WALL OBSERVED 16" X 16" MAT #3 TO DEPTH 1 1/2' BELOW CHANNEL OK TO PLACE FOOTING IN EARTH |
|
| 10/17/2007 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* COLUMN & CONTINUOUS FOOTINGS FROM G-J/1-15 (LESS THICKENED SLAB FOOTINGS) |