Inspection History Details
Inspection Status: Approved
Inspection History: MECHANICAL - ABOVE CEILING
Permit Number - T07CM02550
Inspection Description - MECHANICAL - ABOVE CEILING
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/21/2009 | MECHANICAL - ABOVE CEILING | Approved | IVRS - Inspection :* | |
08/13/2009 | MECHANICAL - ABOVE CEILING | Partial Approval | IVRS - Inspection :* 1) STILL WAITING FOR GREASE DUCT ACCESS DOORS 2) PROVIDE INSTALLATION INSTRUCTIONS ON HOBALT OVENS 3) PROVIDE EXTENSION COLLARS ON GRILLS WITH FLEX DUCT |
|
08/10/2009 | MECHANICAL - ABOVE CEILING | Partial Approval | IVRS - Inspection :* 1) SUPPORT FLEX DUCTS IN OFFICE ARE ROOM 109. OK CEILING TILES THIS AREA. WILL CHECK ON NEXT VISIT 2) K3 2ND LAYER FIRE WRAP OK 3) OK CEILING TILES FOOD STORAGE ARE 4) DUCT THRU WALL OK |
|
08/07/2009 | MECHANICAL - ABOVE CEILING | Not ready for Inspection | IVRS - Inspection :* | |
08/03/2009 | MECHANICAL - ABOVE CEILING | Partial Approval | IVRS - Inspection :* 1) K1-SECOND LAYER WRAP OK, K3-OK FOR SECOND LAYER, PROVIDE ACCESS DOORS PRIOR TO TILES BEING INSTALLED IN CEILING 2) CUSTOMER SERVICE AREA OK FOR TILES |
|
07/31/2009 | MECHANICAL - ABOVE CEILING | Partial Approval | IVRS - Inspection :* 1) OK 2ND LAYER K.E.-3 2) OPTICAL 200 OK TILES |
|
07/30/2009 | MECHANICAL - ABOVE CEILING | Partial Approval | IVRS - Inspection :* PARTIAL FOOD COURT ( K.E. -3 ) OK FOR 1ST LAYER OF FIRE WRAP ON HORIZ. DUCT |
|
07/29/2009 | MECHANICAL - ABOVE CEILING | Partial Approval | IVRS - Inspection :* | |
07/28/2009 | MECHANICAL - ABOVE CEILING | Partial Approval | IVRS - Inspection :* 1) DELI HOO OK FOR 2ND WRAP ON TYPE 1 DUCT |
|
07/27/2009 | MECHANICAL - ABOVE CEILING | Partial Approval | IVRS - Inspection :* 1) K.E.-1 SMOKE TEST OK EXCEPT 3' ADAPTER FROM HOOD 2) K.E.-3 SMOKE TEST OK ON DROP FROM CURB TO 1ST ELBOW, OK TO 1ST LAYER WRAP THESE AREAS 3) DELI AREA OK FOR TILES EXCEPT AREA OF DUCT THRU WALL |
|
07/23/2009 | MECHANICAL - ABOVE CEILING | Partial Approval | IVRS - Inspection :* 1) PROVIDE NON COMBUSTIBLE WALL COVERING WITHIN 18" IN ALL DIRECTIONS OF HOOD OPENINGS 2) REMOVE FRP FIRST |
|
07/22/2009 | MECHANICAL - ABOVE CEILING | Partial Approval | IVRS - Inspection :* 1) BAKERY/DELI HOOD EXHAUST DUCT, 1ST 4' SMOKE TEST OK, OK TO WRAP AND INSTALL 2) FOOD CART OK FOR TILES 3) PROVIDE METAL OVER SHEETROCKL PER I.M.C |
|
07/15/2009 | MECHANICAL - ABOVE CEILING | Partial Approval | IVRS - Inspection :* 1) OK FOR TILES ALL SALES FLOOR |
|
07/10/2009 | MECHANICAL - ABOVE CEILING | Partial Approval | IVRS - Inspection :* 1) OK TO SHEETROCK SOUTH ENTRY HARD LID 2) CORRECTIONS DATED 7/1/09-OK 3) SEALED JOINTS OK ON ALL ROUGH DUCT |
|
07/09/2009 | MECHANICAL - ABOVE CEILING | Partial Approval | IVRS - Inspection :* 1) COLUMN LINES 6 THRU 9 OK TO TILE 2) OK TO ROCK STORE FRONT UP TO LINEAR BOXES 3) PROVIDE MAP R-4.2 AT LINEAR BOXES |
|
07/07/2009 | MECHANICAL - ABOVE CEILING | Partial Approval | IVRS - Inspection :* 1) OK FOR SHEETROCK STARBUCKS AREA |
|
07/01/2009 | MECHANICAL - ABOVE CEILING | Partial Approval | IVRS - Inspection :* 1) OK TO SHEETROCK NORTH ENTRY VESTIBULE 2) SUPPORT FLEX OFF OF PIPES AT GRID LINE 9J,C BETWEEN 9 + 10, + E BETWEEN 10 + 11 3) OK FOR CEILING TILES FROM GRID LINE 9-12 |
|
06/26/2009 | MECHANICAL - ABOVE CEILING | Partial Approval | IVRS - Inspection :* 1) CHECKED SEALED JOINTS ON SUSPENDED ROUGH 2 DUCT OK TO INSULATE |
|
06/02/2009 | MECHANICAL - ABOVE CEILING | Partial Approval | IVRS - Inspection :* | |
03/16/2009 | MECHANICAL - ABOVE CEILING | Partial Approval | IVRS - Inspection :* |