Inspection History Details
Permit: T07CM02471
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/28/2008 | ENGINEERING - FINAL | Approved | Contractor provided letter from Tucson Airport Authority in regards to site being stabilized. | |
| 04/22/2008 | ENGINEERING - FINAL | Partial Approval | Met with contractor on site went over site plan, truncated domes and stailizing lot. | |
| 04/01/2008 | ENGINEERING - FINAL | Denied | Contractor needs to: 1- Need to stabilize all areas disturbed by construction. 2- Clean drainage channel. 3- Remove trailers from site. 4- Remove port-a-potty from site. 5- Install truncated domes on HC ramp. 6- Install scupper northeast corner, per SD 204. |