Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/31/2008 | PLUMBING - INTERMEDIATE | Approved | IVRS - Inspection :* | |
| 03/28/2008 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* | |
| 03/27/2008 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* 1. 705.1.1 2006 UPC CAULKED FLANGES ALSO, AFTER INSPECTION A "DUTCHMAN" WILL HAVE TO BE INSTALLED 2. ALL FLANGES TO BE SECURED TO THE FLOOR 3. RELOCATED FLOOR SINK AT EINSTEIN'S - OK TO COVER 4. NO GAS ISOMETRIC - GENERAL NOTE #1 ON P-1 IS SIMPLY A NOTE TO SUPPLY GAS FROM A SEPARATE METER. PROVIDE APPROVED ISOMETRIC. |
|
| 03/25/2008 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* | |
| 03/12/2008 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* CLOSET FLANGES TO EXTEND 1/4" ABOVE FINISHED FLOOR |
|
| 03/06/2008 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1. REPAIR OF HOT & COLD WATER SUPPLY IN RESTROOMS 112, 113 OK TO COVER WALLS 2. NEED TO EXPOSE CLOSET FLANGE IN RESTROOMS 106, 107 |
|
| 02/22/2008 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* | |
| 02/20/2008 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* | |
| 02/06/2008 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* MAIN KITCHEN - UNDERSLAB TRUNK LINE TO GREASE INTERCEPTOR INCLUDING RELOCATION OF 2 FLOOR SINKS AND ADDITION OF 5 HAND SINKS. - EOL CLEANOUT TO FLOOR HEIGHT @ FLOOR SINK - IN WALL CLEANOUTS 4" @ HAND SINK & FLOOR SINK S.E CORNER OF KITCHEN - TIE IN TO EXISTING WITH CIX PLASTIC MISSION BANDS 60LB. TORQUE SPEC. VERIFIED OK TO COVER |
|
| 01/15/2008 | PLUMBING - INTERMEDIATE | Partial Approval | COVER UNDER SLAB DRAIN LINE IN EINSTEINS AT YOUR OWN RISK, MEETS CODE BUT RED LINE DRAWING HAS NOT BEEN APPROVED. OK TO SHEET ROCK BACK OF BAR WALL (HOT AND COLD CU WATER SUPPLY) |
|
| 01/03/2008 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* BAR AREA RED LINED INCLUDE ISO REPAIR MADE IN WOMENS RESTROOM #107 PLEASE CALL INSPECTIONS THROUGH THE IVR SYSTEMS |
|
| 10/31/2007 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* OK TO COVER WALLS AND FLOOR AT EINSTEINS REPAIR AT TOILET ROOM 107 MADE OK |
|
| 10/26/2007 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1. HORIZONTAL ABS OVERHEAD TO BE SUPPORTED 2. ALL VERTICAL PIPING TO BE SUPPORTED SEE P.2/6.4 3. PLAN CALLS FOR TYPE "L" COPPER 4. THIS IS FOR EINSTEIN'S ONLY |