Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/01/2008 | ELECTRIC - FINAL | Approved | IVRS - Inspection :* | |
| 04/14/2008 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* LAST ITEMS: 1. UNLISTED EQUIPMENT - CASH MACHINE 2. SUBMIT AS BUILTS FOR FINAL PLAN REVISION |
|
| 04/11/2008 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* ABOVE CEILING WALKWAY: 1. FINISH SUPPORT VDV 2. FINISH SERVICE LIGHTS PER 210.70 |
|
| 04/10/2008 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :* CANCELED |
|
| 04/09/2008 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
| 04/09/2008 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* FINISH 1, 2, 3 & 5 OF 4/7/08 OK KIT GFCI & HOOD CONTACTORS |
|
| 04/08/2008 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* 1. KITCHEN RECEPTACLES TO BE GFCI PROTECTED 210.8 2. HOOD CONTACTOR ENCLOSURE: TAPE TO ENCIRCLE CONDUCTOR ENTIRE EXPOSE LENGTH 3. FINISH ITEM 1, 2, 3, 5, 6 AND 7 PREVIOUS INSPECTION |
|
| 04/07/2008 | ELECTRIC - FINAL | Denied | IVRS - Inspection : The wiring is not complete or does not comply with code.| 245* 1. CANNOT TAPE A WHITE CONDUCTOR A COLOR 2. MULTIPLE TERMINATIONS ON LUGS 3. VERIFY LOADS AND TAPS FOR WEST AC'S 4. BOND DISCONNECT ENCLOSURES 5. LABEL ALL DISCONNECTS 6. FINISH PANEL LABELING 7. SEAL ROOF JACKS 8. SECURE SUPPORT STANDS TO STRUCTURE 9. TIGHTEN LOOSE FITTINGS 10. PROTECT SEALTITE FROM SHARP METAL EDGES |
|
| 04/03/2008 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :* CANCELED |
|
| 04/02/2008 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :* CANCELED |
|
| 04/01/2008 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* 1. BOXES PER 314.20 2. ATTACH DISCONNECT TO STRUCTURE AND MAINTAIN WORKING CLEARANCES 3. STRAP CONDUITS TO EXISTING A/C 4. MAKE STORAGE AREA SAFE OK ROOMS 114, 115 AND BREAK ROOM |
|
| 03/31/2008 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* 1. LISTING LABELS NOT TO BE APPLIED IF OTHER THAN BY TESTING AGENCY OK FOR USAGE OF LOBBY, BAR, MAILROOM, FRONT BATHROOMS, RECEPTION OFFICES & EINSTEIN'S SUBJECT TO LEERAY'S DETERMINATION - UNLISTED EQUIPMENT TO BE USED. OK PANEL "T" |
|
| 03/27/2008 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* 1. LABEL PANEL DIRECTORIES 408.4 2. EXCESS PAINT ON DEVICE TERMINALS 3. LISTING LABELS CASH MACHINE & JUKE BOX 4. BAR & LOBBY EXITS TO BE AS PER 700.12 |
|
| 03/19/2008 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* 1) OK PANELS EB, M, M1, A TO ENERGIZE 2) CONTRACTOR TO MAINTAIN LOCKOUT/TAG OUT ON SERVICE AT ALL TIMES |
|
| 03/17/2008 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* RECEIVED LETTER FOR TORQUE 1. FINISH H2O BOND 2. BOND JUMPER TO BE SIZED PER 250.102 & 250.66 3. BREAKER FOR SWITCH GEAR NOT AS PER PLANS 4. SEPARATE CONDUCTOR FROM UNPROTECTED BUSS BEFORE MAIN |
|
| 03/10/2008 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :* BAR, LOBBY, MAIL ROOM, RESTROOMS AND EINSTEIN'S: 1. BOXES MORE THAN 1/4" 2. SECURE BOXES INTO WALL 3. GROUND HARDWARE TO LIGHT FIXTURES - GROUND TRAC'S 4. VERIFY LISTING OF ALL EQUIPMENT 5. NO POWER AT THIS TIME OK IMC - 1 1/2" OUT TO TRAILER |
|
| 03/03/2008 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :* NO SERVICE INSPECTIONS HAVE BEEN DONE AT THIS TIME FINISH INSTALLING DEVICES NOTE 314.20 BOXES MORE THAN 1/4" BACK NOTE 725.6, 800.6, 300.11 PANEL LABELING TO BE AS PER 408.4 |
|
| 10/11/2007 | ELECTRIC - FINAL | Not ready for Inspection | GEAR IS EXISTING IN QUESTIONABLE CONDITION. CODE VIOLATIONS ARE PRESENT. ANY FIELD MODIFICATION WILL NEED TO BE DONE BY A THIRD PARTY EVALUATION PLANS DO NOT MATCH INSTALLED EQUIPMENT FOR CONDUCTORS OR LOADS WORK APPEARS TO BE INSTALLED AT A LATER DATE THAN ORIGINAL INSTALL. CONDITION LOOKS TO HAVE NOT BEEN CODE COMPLIANT AT TIME OF WORK DONE. RECEIVED CK#9050 FOR $150.. |