Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/12/2007 | ELECTRIC - INTERMEDIATE | Approved | IVRS - Inspection :* | |
| 07/06/2007 | ELECTRIC - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. PANEL B SCHEDULE HAS TO BE FILLED OUT 2. SOME CORDS IMPROPERLY SET INTO FITTINGS AT DISCONNECTS 3. WHITE WIRES WHEN USED AS HOTS CANNOT BE LEFT AS WHITE 4. PERMANENTLY MARK ALL DISCONNECTS 5. PNL B IS A 60 AMP LOAD CENTER, LOAD CALCULATIONS ARE SHOWN AS MORE THAN ALLOWED BUT OK ON DEMAND -- OTHER ITEMS THAN SHOWN HAVE TO BE ADDED. 6. SECURE FLEX FROM DISCONNECTS WITHIN 12" OF DISCONNECTS. |