Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/03/2007 | ENGINEERING - FINAL | Approved | ||
| 09/25/2007 | ENGINEERING - FINAL | Denied | 1. CALL ONE DAY PRIOR TO BUILDING FINAL INSPECTION. 2. REMOVE PORT A POT. 3. REMOVE TRASH ROLLOFF. 4. CLEAN UP AND REMOVE ALL CONSTRUCTION MATERIAL AND DEBRIS. 5. CLEAN OUT WASH OUT FROM STORMDRAIN CATCH BASIN AND GRATE. |