Inspection History Details
Inspection Status: Approved
Inspection History: EXT METAL CLIPS/EXT SHEATHING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/04/2008 | EXT METAL CLIPS/EXT SHEATHING | Approved | IVRS - Inspection :* | |
| 12/07/2007 | EXT METAL CLIPS/EXT SHEATHING | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) THE TRUSS MATTS SHOW LAYOUT BUT NOT HANGERS 2) SIMPSON REQUIRES 16D NAILS IN HPAD 22 HOLDOWNS. .102 X 3 1/4) YOU USED NAILS APPROX .121 X 3 1/4 3) ROOF NAILING OK, SUPPORT EDGES THAT ARE SAGGED WITH BLOCKING. OK TO DRY IN 4) NEED TRUSS CALCS TO CHECK TRUSS INSTALLATION. HANGERS TO GIRDER ? |