Permit: T07CM02131

Parcel: 12912153B

Inspection Status: Approved

Inspection History: PLUMBING - INTERMEDIATE

Date Description Inspector Results Comments
10/03/2007 PLUMBING - INTERMEDIATE Approved IVRS - Inspection :*
OK TO COVER ALL AREAS
10/02/2007 PLUMBING - INTERMEDIATE Not ready for Inspection IVRS - Inspection :*
REC'D LETTER ALLOWING PEX
10/01/2007 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection :*
1. CONTRACTOR TO HAVE MATERIAL CHANGE FOR YARDWATER ADDED TO LETTER
2. CONTRACTOR TO ADD HANGERS OVERHEAD AS REQUIRED
3. WATER TEST OK ON DWV
4. PRESSURE TEST FOR PEX OK
5. TUBS OK

OK TO COVER ALL AREAS
09/28/2007 PLUMBING - INTERMEDIATE Not ready for Inspection IVRS - Inspection :*
1) PVC YARDWATER NOT OK TO COVER WITH CLEANFILL
2) PLAN CALLS FOR TYPE "L" COPPER INSTALLED IS PEX
3) PEX PLAN CALLS FOR SCHEDULE 40 PVC-INSTALLED IS PEX
4) ABS TO BE SUPPORTED AT EACH CHANGE OF DIRECTION OR ELEVATION AND AT THE END OF BRANCHES THEN NO MORE THAN FOUR FEET BETWEEN HANGERS
5) VENTS BELOW FLOOD RIM TO BE DRAINAGE FITTING
6) HORIZONTAL X HORIZONTAL CHANGE OF DIRECTION TO BE A SWEEP
7) NEED TO SEE FLANGES
8) NO TEST ON ABS
9) SUPPORT VERTICAL PIPING