Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
Permit Number - T07CM02122
Inspection Description - ELECTRIC - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/27/2007 | ELECTRIC - FINAL | Approved | IVRS - Inspection :* | |
11/16/2007 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. PANEL DIRECTORIES NOT CORRECT - GO THROUGH ALL BREAKERS 2. DOOR OPERATORS TO BE COMPLETE/WIRE WITH MC - NOT CORD 3. INSTALL SIGN AT SERVICE PER NEC 700.8 RED WITH WHITE LETTERING 4. CHECK GEN FUEL LEVEL - NEC 700.12 132 2 HOURS |
|
11/15/2007 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* ROOFTOP INSPECTION 1. SAT. DISH TO BE PROPERLY GROUNDED, RUN CONDUCTORS IN RACEWAY OR PROVIDE OTHER SUITABLE MEANS TO PROTECT FROM PHYSICAL DAMAGE/TRIPPING HAZARD 2. ALL ROOFTOP EQUIPMENT TO HAVE PROPER CKT AND OVERCURRENT PROTECTION PER THEIR DATA PLATE 3. PANEL DIRECTORY'S TO BE CORRECT 4. SERVICE RECEPTACLES ON ROOF TO HAVE GFI PROTECTION 5. HP11 DISCONNECT NEEDS PROPER FRONT WORKING CLEARANCE 6. ALL FLEX TO BE SECURED WITHIN 12" OF ENCLOSURES INTERIOR: 1. IDENTIFY ALL DISCONNECTS AND PROVIDE PROPER FRONT WORKING CLEARANCE 2. SDS CONTROL UNIT TO HAVE PROPER FRONT WORKING CLEARANCE 3. INSTALL ALL COVERS 4. SECURE ALL FLEX WITHIN 12" OF ENCLOSURES |