Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
Permit Number - T07CM01982
Inspection Description - ENGINEERING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/30/2008 | ENGINEERING - FINAL | Approved | ||
06/27/2008 | ENGINEERING - FINAL | Partial Approval | Contractor needs to address punch list item #2 - Provide approved revised drawing for inspection. | |
11/27/2007 | ENGINEERING - FINAL | Partial Approval | OK FOR TEMP C OF O | |
11/13/2007 | ENGINEERING - FINAL | Denied | PROVIDE PHASE DRAWING | |
11/09/2007 | ENGINEERING - FINAL | Denied | Contractor needs to: 1- Provide phased plan. 2- Provide revised drawing showing all changes. Walked site with project manager. |