Inspection History Details
Inspection Status: Not ready for Inspection
Inspection History: ELECTRIC - FINAL
Permit Number - T07CM01970
Inspection Description - ELECTRIC - FINAL
Inspection Status - Not ready for Inspection
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/24/2008 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. WHAT DOES THIS PERMIT COVER JUST PHASE 1 OR PHASE 1 AND 2? 2. INSTALLATION NOT PER PLAN 3. GROUNDING NOT PER PLAN & NEC 4. LUGS & TERMINALS NOT LISTED FOR MULTIPLE GROUND TERMINATIONS 5. EM LIGHTING NOT PER PLAN 6. RECEPT WITH REVERSE POLARITY |
|
| 06/16/2008 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* THE ELECTRICAL CONTRACTOR NEEDS TO BE ON SITE WITH THE PLANS & TO OPEN EQUIPMENT |