Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Partial Approval
Inspection History: ELECTRIC - INTERMEDIATE
Permit Number - T07CM01970
Inspection Description - ELECTRIC - INTERMEDIATE
Inspection Status - Partial Approval
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/10/2007 | ELECTRIC - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1. PERFORMANCE TEST APPROVAL LETTER RECEIVED TODAY 2. I WILL CHECK MDS AREA WITH FINAL |
|
| 10/05/2007 | ELECTRIC - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. SERVICE GFI TO HAVE A PERFORMANCE TEST PER NEC 230.95 2. SECURE SERVICE TO SLAB - NEC 110.13 3. LOCKNUTS TO BE MADE UP TIGHT TO ENCLOSURES 4. BOND ALL METAL PIPING SYSTEM IN CHILLER ROOM TO MDS OLD BONDING CLAMPS, WIRE NOT TO BE USED - NEC 250.104 TORQUE LETTERS FOR MDS AND SERVICE RECEIVED TODAY |
|
| 08/20/2007 | ELECTRIC - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1) DISC. S.W. COMBO AT P1 IN VIOLATION OF DEDICATED WORKING CLEARANCE PER 110.26 NEC-SHOULD HAVE 30" HORIZONTAL & 36" IN FRONT 2) SUPPORT CONDUITS ON RACK PER NEC WITHIN 3' OF TERMINATION AND AT 10' INTERVALS 3) PLEASE HAVE CONTRACTOR ON SITE NEXT INSPECTION TO OPEN EQUIPMENT. NOTE: EQUIPMENT UNDER PHASE ONE IN USE AT THIS TIME |