Inspection Status: Approved

Inspection History: EXCAVATION/LAYOUT REBAR & ZON

Date Description Inspector Results Comments
05/24/2007 EXCAVATION/LAYOUT REBAR & ZON Approved IVRS - Inspection :*
05/22/2007 EXCAVATION/LAYOUT REBAR & ZON Denied IVRS - Inspection :
See detailed listing on site.| 999*
1) THERE ARE 5 EACH HOLDOWNS TO BE INSTALLED IN THE INTERIOR AREA OF THE SLAB. THESE HOLDOWNS REQUIRE 5" EMBEDMENT IN THE SLAB AND REQUIRE AN ADDITIONAL 3" OF CONCRETE BELOW THE ANCHORS. HAVE PLAN REVISED TO PROVIDE ADEQUATE CONCRETE DEPTH IN HOLDOWN LOCATIONS
05/18/2007 EXCAVATION/LAYOUT REBAR & ZON Denied IVRS - Inspection :
See detailed listing on site.| 999*
1) NEED REBAR FRONT PORCH
2) H.D.'S EAST WALL WRONG LOCATION