Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/06/2007 | ENGINEERING - FINAL | Approved | PER INSP COPY | |
| 08/30/2007 | ENGINEERING - FINAL | Denied | Contractor needs to: CP 1- Complete all work. (drywall and paint) DRAWINGS ON SITE 2- Provide approved drawings for inspection. NOT CP 3- Contractor needs to make sure all wash out is cleaned up. DRYWALL WASHED OUT AT REAR OF BLDG. CONSTRUCTION DEBRIS NOT CLEANED UP. MARC IS REGULAR INSPECTOR 240-9871 |
|
| 07/30/2007 | ENGINEERING - FINAL | Denied | Contractor needs to: 1- Complete all work. (drywall and paint) 2- Provide approved drawings for inspection. 3- Contractor needs to make sure all wash out is cleaned up. |