Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/25/2008 | ENGINEERING - FINAL | Approved | SITE PER FUTURE GRADING PLAN | |
| 04/23/2008 | ENGINEERING - FINAL | Partial Approval | CP-INSTALL BIKE RACKS PER APPROVED PLAN ?-BUILD WATER HARVESTING AREA PER PLAN OK-TRASH ENCLOSURE DOES NOT MEET COT REQUIREMENTS PER DETAIL ENCLOSURE MUST BE 10' DEEP CONTACT ANDY VERA WITH ENV. SVCS. 791-5543 XTN 1212 -PAAL IS 23'5" NO DIMENSIONING FOR WIDTH-SHOULD BE 24' CP-REMOVE PORTA TOILET PA-COMPLETE ALL SITE WORK CP-STABILIZE ALL DISTURBED AREAS PA-GENERAL CLEAN UP ?- PLZ CLARIFY SITE PLAN SHOWS WATER HARVESTING AREA DIFFERENT FROM GRADING PLAN, GRADING PLAN AND LANDSCAPE PLAN DO NOT MATCH. WHICH IS CORRECT FOR DRAINAGE PATTERN ON SITE AND WHICH MEETS COT REQUIREMENTS FOR WATER HARVESTING? |
|
| 04/10/2008 | ENGINEERING - FINAL | Not ready for Inspection | PER PHONE MESSAGE FROM ANDY VERA 4/9 3:44 TRASH ENCLOSURE AT THIS SITE IS ACCEPTABLE | |
| 04/09/2008 | ENGINEERING - FINAL | Not ready for Inspection | -INSTALL BIKE RACKS PER APPROVED PLAN -BUILD WATER HARVESTING AREA PER PLAN -TRASH ENCLOSURE DOES NOT MEET COT REQUIREMENTS PER DETAIL ENCLOSURE MUST BE 10' DEEP CONTACT ANDY VERA WITH ENV. SVCS. 791-5543 XTN 1212 -PAAL IS 23'5" NO DIMENSIONING FOR WIDTH-SHOULD BE 24' -REMOVE PORTA TOILET -COMPLETE ALL SITE WORK -STABILIZE ALL DISTURBED AREAS -GENERAL CLEAN UP |