Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/23/2008 | ENGINEERING - FINAL | Approved | ||
| 04/23/2008 | ENGINEERING - FINAL | Approved | CP-COMPLETE ALL ASPHALT PATCHES CP-CLEAN UP WASH OUT AND CONSTRUCTION DEBRIS S OF SCREEN WALL CP*-ADDRESS ADA ISSUES-APPROVED REVISION MUST BE READY TO BUILD BEFORE TEMP C OF O. THIS INCLUDES H/C PARKING STALLS TOO STEEP ON N SIDE FO BLDG AND ADA ACCESSIBLE ROUTE FROM ROW TO 8265. CP-INSTALL BIKE LOCKERS PER PLAN (DEV PLAN)--2 BIKE LOCKERS INSTALLED NE CORNER OF BLDG TOTAL OF 4 EACH CLASS 1 + 2 INSTALLED ON SITE *REVISED DEVELOPMENT PLAN ON SITE-NO REVISED GRADING PLAN |
|
| 04/21/2008 | ENGINEERING - FINAL | Partial Approval | -COMPLETE ALL ASPHALT PATCHES PARTIAL-CLEAN UP WASH OUT AND CONSTRUCTION DEBRIS S OF SCREEN WALL *-ADDRESS ADA ISSUES-APPROVED REVISION MUST BE READY TO BUILD BEFORE TEMP C OF O. THIS INCLUDES H/C PARKING STALLS TOO STEEP ON N SIDE FO BLDG AND ADA ACCESSIBLE ROUTE FROM ROW TO 8265. CP-INSTALL BIKE LOCKERS PER PLAN (DEV PLAN)--2 BIKE LOCKERS INSTALLED NE CORNER OF BLDG TOTAL OF 4 EACH CLASS 1 + 2 INSTALLED ON SITE *REVISED DEVELOPMENT PLAN ON SITE-NO REVISED GRADING PLAN |
|
| 04/08/2008 | ENGINEERING - FINAL | Correction Required | CP-REMOVE THE PORTA TOILETS PARTIAL-CLEAN UP WASH OUT AND CONSTRUCTION DEBRIS S OF SCREEN WALL WORK BEING DONE-STABILIZE ALL DISTURBED AREAS S OF SCREEN WALL -ADDRESS ADA ISSUES-APPROVED REVISION MUST BE READY TO BUILD BEFORE TEMP C OF O. THIS INCLUDES H/C PARKING STALLS TOO STEEP ON N SIDE FO BLDG AND ADA ACCESSIBLE ROUTE FROM ROW TO 8265. CP-THIS INCLUDES H/C PARKING STALLS TOO STEEP ON N SIDE FO BLDG NOT DONE-INSTALL BIKE LOCKERS PER PLAN (DEV PLAN) |
|
| 03/26/2008 | ENGINEERING - FINAL | Correction Required | -REMOVE THE PORTA TOILETS -CLEAN UP WASH OUT AND CONSTRUCTION DEBRIS S OF SCREEN WALL -STABILIZE ALL DISTURBED AREAS S OF SCREEN WALL -ADDRESS ADA ISSUES-APPROVED REVISION MUST BE READY TO BUILD BEFORE TEMP C OF O. THIS INCLUDES H/C PARKING STALLS TOO STEEP ON N SIDE FO BLDG AND ADA ACCESSIBLE ROUTE FROM ROW TO 8265. -INSTALL BIKE LOCKERS PER PLAN (DEV PLAN) |
|
| 02/29/2008 | ENGINEERING - FINAL | Correction Required | BEFORE C OF O ADDRESS H/C ACCESSIBLE ROUTE FROM WEST BUILDING TO EAST BUILDING. REVISED ARCHITECHTURAL DRAWING/SITE PLAN SHOWS BOTH FFE'S AT SAME ELEVATION. THIS IS NOT THE SITE CONDITION. ALL CHANGES MUST BE REVIEWED AND APPROVED. STAMPED PLANS MUST BE ON SITE FOR C OF O INSPECTION. |