Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/12/2007 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* | |
| 06/11/2007 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) WATER CLOSET HAS TO BE MOVED FOR MIN. DISTANCE WILL RE-CHECK WATER TEST |
|
| 06/05/2007 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) LEAK AT WATER CLOSET 2) OK TO BACKFILL TRENCH CLEANOUT TO HCS CONNECTION |
|
| 06/01/2007 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) NO 10' WATER TEST 2) 90 DEGREE ELBOW ON 4" LINE NEEDS TO BE LONG RADIUS ON 2-45 DEGREE ELBOW 3) 90 DEGREE ELBOW ON 3" LINE NEEDS TO BE LONG RADIUS ON 2-45 DEGREE ELBOW 4) MISSING TRACER WIRE FROM CLEANOUT TO HCS CONNECTION |