Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/27/2008 | ENGINEERING - FINAL | Approved | WORK BEING DONE ON DRIVEWAY DRIVEWAY IS NOT PART OF GRADING PLAN |
|
| 10/05/2007 | ENGINEERING - FINAL | Correction Required | THERE IS NO GRADING PLAN ASSOCIATED WITH THIS SITE 9/27/07 PAUL STATED A GRADING PERMIT MUST BE OBTAINED TALKED TO CONTRACTOR ON SITE AND REVIEWER IN OFFICE ANY WORK DONE WITHOUT A GRADING PERMIT IS AT OWNER/CONTRACTOR'S PERIL PER PAUL RIP RAP WITH FILTER FABRIC CAN BE ACCEPTABLE ON 1.5:1 SLOPE IF SOILS REPORT INDICATES THIS IS TO BE DETERMINED ON GRADING PLAN |
|
| 10/05/2007 | ENGINEERING - FINAL | Correction Required | I spoke to the Owner David Tesar, and told him that a grading permit is required, he said that he will go down to 201 Stone by Monday and check with engineering about what he needs to get a permit. |