Inspection Status: Approved

Inspection History: REINFORCED MASONRY PRE-GROUT

Date Description Inspector Results Comments
08/08/2008 REINFORCED MASONRY PRE-GROUT Approved IVRS - Inspection :*
04/21/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
REINFORCEMENT STEEL @ CMU 4 EXTERIOR COLUMNS TO 16'
RESTROOM BLDG. 4TH LIFT @ WALLS TO 14'9" AND CONTROL ROOM WALLS W/SLAB TIE IN DOWELS & EMBED PLATES TO 9'9"
04/16/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
RESTROOM BUILDING ON S/E OF AUDITORIUM CMU WALLS
THIRD LIFT FROM 8' TO 12' --- OK TO GROUT
04/11/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
7 CMU CANOPY SUPPORT COLUMNS @ SOUTHEAST
CORNER OF BUILDING FROM 4'8" TO 8'8"
04/10/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
RESTROOM BUILDING ON EAST EXTERIOR FROM
4'8" TO 8'8" OK
04/09/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
8 CMU WALL COLUMNS @ SOUTHEAST CORNER OF AUDITORIUM EXTERIOR
1ST LIFT TO 5FT - AND RESTROOM BLDG. CMU
WALLS TO 5FT 1ST LIFT
04/08/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
CMU WALLS @ RESTROOM BLDG. @ SOUTHEAST CORNER OF AUDITORIUM 1ST LIFT FROM TOP OF STEM TO 4'
02/29/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
CMU REINFORCEMENT STEEL @ EAST ENTRY ABOVE STEEL COLUMN J/1 TO 2 -- TOPOUT
02/28/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
EAST ENTRY ABOVE STEEL LINE @ J/1 TO 2 FROM 30' TO 36'
W/APPROVAL FROM ENGINEER
02/26/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
EAST ENTRY ABOVE STEEL COLUMN FROM 24' TO 30'
APPROVED BY ENGINEER
01/10/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
CMU REINFORCEMENT STEEL @ GRID
B/2 TO 3 TOP OUT TO 38'8"
01/09/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
CMU REINFORCEMENT STEEL @ GRID B/2 TO 2.8
FROM 30' TO 34' OK TO GROUT
01/08/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
CMU REINFORCEMENT @ B/2 TO 2.8
L/3 TO 5, 5/J.8 TO L & J.8/5 TO 5.8 TOW FROM 4' TO 8'
AND CORNERS @ 6 & K FROM 0' TO 4'
ALSO B/2 TO 2.8 FROM 18'8" TO 24' AND 3/K TO L, L/3 TO 5,
5/J.8 TO L AND J.8/5 TO 5.8 FROM 8' TO 10' AND
CORNERS @ 6 & K FROM 4' TO 8'
01/02/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
CMU REINFORCEMENT STEEL @ GRID L/3 TO 5, 3/K TO L, &
5/K TO L FROM 0' TO 4' AFFE
12/21/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) CMU REINFORCEMENT STEEL AT GRID 1/A TO K-K/1 TO 2 & 2/H TO K LIFT #13 FROM 48' TO 50' TOP OUT
12/20/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
CMU REINFORCEMENT STEEL @ GRID A/1 TO 2, 2/A TO C,
1/A TO K , K/1 TO 2, 2/H TO K FROM 46' TO 50' (TOP OUT)
12/19/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
CMU REINFORCEMENT STEEL @ GRID
1/A TO K & K/1 TO 2
12TH LIFT 44' TO 48' AND A/1 TO 2 AND 2/A TO D
13TH LIFT T.O.W 46' TO 50'
12/18/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
CMU REINFORCEMENT STEEL @ A/2 TO 1 - 2/A TO C & 1/A TO K
FROM 47' TO 50' (TOP OUT)
12/14/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
E-1 TO H-2 OK TO GROUT TO 44'
12/13/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
12" CMU WALLS @ LINES A/1- 2 @ 40'-44'
1/D TO K/ - K/2 40'-44'
LINE 2/H-K @ 36' TO 40'
OK TO GROUT PROGRESS AREAS
12/12/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
12" CMU REINFORCEMENT STEEL @ GRID
1/D TO K, K/1 TO 2 AND 2/H TO K
LIFT 10 FROM 36' TO 40'
12/11/2007 REINFORCED MASONRY PRE-GROUT Not ready for Inspection IVRS - Inspection :*
RAINED OUT
12/10/2007 REINFORCED MASONRY PRE-GROUT Not ready for Inspection IVRS - Inspection :*
CONTRACTOR CANCELLED - RAINED OUT
12/06/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
CMU REINFORCEMENT STEEL @ GRID A/1 TO 2, 1/A TO C &
2/A TO C --- 10TH LIFT FROM 36' TO 40'
12/05/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
CMU REINFORCEMENT 12" CMU STEEL @ GRID
1/A TO K & K/1 TO 2
9TH LIFT FROM 32' TO 36'
12/04/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
12" CMU
CMU REINFORCEMENT STEEL @ GRID 1/A TO K - K/1 TO 2
2/H TO K FROM 32' TO 36' AND J/3.4 TO 6 - 6/B TO J &
B/3.4 TO 6 TOP OUT
12/03/2007 REINFORCED MASONRY PRE-GROUT Not ready for Inspection IVRS - Inspection :*
11/30/2007 REINFORCED MASONRY PRE-GROUT Not ready for Inspection IVRS - Inspection :*
NO ACCESS - GATE LOCKED
11/29/2007 REINFORCED MASONRY PRE-GROUT Not ready for Inspection IVRS - Inspection :*
RAINED OUT
11/28/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
CMU REINFORCEMENT STEEL @ GRID LINES A/1 TO 2 AND
2/A TO C FROM 32' TO 36' AFF
11/26/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
CMU REINFORCEMENT STEEL @ GRID LINES
A/1 TO 2 - 2/1 TO 2 - B/3.4 TO 6 - 6/B TO H & H/3 TO 6
FROM 28 FOOT TO 32 FOOT A.F.F.E
11/21/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
CMU REINFORCEMENT STEEL @ GRID LINE A/1 TO 2
1/A TO K - K/1 TO 2 FROM 24 FOOT TO 28 FOOT - OK TO GROUT
11/20/2007 REINFORCED MASONRY PRE-GROUT Not ready for Inspection IVRS - Inspection :*
CANCELLED BY CONTRACTOR
11/19/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
CMU REINFORCEMENT STEEL @ GRID LINES K/1 TO 2
2/H TO K - B/3 TO 6 & 6/A TO D.5 ABOVE ELEV. 100' OK TO GROUT
11/15/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
CMU STEEL REINFORCEMENT @ GRID J/4 TO 6 AND 6/E TO J
7TH LIFT FROM 20' TO 24'
11/14/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
CMU REINFORCING STEEL @ GRIDS
6/B TO C - B/3.4 TO 6 - LIFT 7 FROM 20' TO 24'
1/B TO D.9 LIFT 6 FROM 16' TO 20' AFF -- OK TO GROUT
11/13/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) CMU REINFORCING STEEL AT GRID LINES 1/0.9 TO K-K/1 TO 2-A/TO 2 AND LINE 2/A TO C 6TH LIFT-OK TO GROUT
11/09/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
CMU REINFORCEMENT STEEL @ GRID 1/C.3 TO K - 5TH LIFT
K/1 TO 2 6TH LIFT - J/5.6 TO 6 - 6/H.3 TO J 16 FEET TO 20 FEET
11/08/2007 REINFORCED MASONRY PRE-GROUT Not ready for Inspection IVRS - Inspection :*
CONTRACTOR CANCELLED
11/07/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
12" CMU REINFORCMENT STEEL @ 6/B TO D.1 @ 12 TO 16 FT
B/3.5 TO 6 - 2/B.5 TO C.5 @ 16 TO 20 FEET A.F.F.E
11/06/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
CMU REINFORCEMENT STEEL @ GRID LINES A/1 TO 2
FROM 16 FOOT TO 20 FOOT AFF
11/05/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
CMU REINFORCEMENT STEEL @ GRID LINES 2/A TO C -
14' TO 20' A.F.F.E
11/02/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
CMU REINFORCEMENT STEEL @ GRID LINES A/1 TO 2
2/A TO C TO 14 FOOT - 1/A TO D 4TH LIFT & LIN 2/H TO H.75 5TH LIFT
11/01/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
CMU REINFORCEMENT STEEL @ GRID LINE A/1 TO 2 - 2/A TO C
2ND LIFT & 2/H TO H.75 -- 5TH LIFT - OK TO GROUT
10/31/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
CMU REINFORCEMENT STEEL @ GRID LINES A/2.5 TO 6
AND 6/A TO B - J/3.5 TO 6 - 6/F TO J 6TH LIFT AND
1/C TO H 4TH LIFT AND COLUMNS
10/30/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
GROUTED - AS PER SPECIAL INSPECTION ON THIS DATE PER LEE RAY
10/29/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
CMU REINFORCEMENT STEEL @ GRID LINES - A/2.5 TO 6
K/2.5 TO 6 TO FIFTH LIFT & WEST STEP TO FFE
10/26/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
8" CMU @ ELEC. DOOR & REAR DOOR - LINE B/2.5 TO 3
2/H TO J - K/1 TO 2 & 1/H TO K 3RD LIFT -
LINE 1/A TO G.3 4TH LIFT -
CMU WALLS @ .05 TI & A.5 TO E.9 - LINE 6/E TO K
B & K/3.5 TO 6 - 2/H TO K 3RD LIFT
10/24/2007 REINFORCED MASONRY PRE-GROUT Not ready for Inspection IVRS - Inspection :*
CONTRACTOR CANCELLED
10/22/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
REINFORCEMENT STEEL @ 8" CMU WALLS AT LINE D.5 @ ELECTRICAL ROOM TO TOPOUT & LINE 2/H TO H.5 2ND LIFT
10/19/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
CMU REINFORCEMENT STEEL @ GRID 6/B TO K 3RD LIFT
K/2.5 TO 6 SECOND LIFT - J/3.5 TO 5.5 & B/2.5 TO 5.5 4TH LIFT
10/18/2007 REINFORCED MASONRY PRE-GROUT Not ready for Inspection IVRS - Inspection :*
10/17/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1. MAKEUP ROOM 1 & 2 NORTH WALL THIRD LIFT W/BOLTS
AND STRAPS
2. LINE 1 FROM D TO H 2ND LIFT
3. LINE K FROM 1 TO 2 3RD LIFT
10/16/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
CMU REINFORCEMENT STEEL @ GRID LINES 6/A TO J
B/2.5 TO 6 2ND LIFT TO 8 FOOT 6 INCH
10/15/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
CMU WALL REINFORCEMENT @ GRID LINES 1/H TO K,
K/1 TO 2, 2ND LIFT TO 8 FOOT AFFE
2/H TO K 1ST LIFT TO 4 FOOT AFFE
AND STEM WALL @ K/2 TO 3 TO FFE
10/11/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
CMU MASONRY REINFORCEMENT @ GRID LINES 1/A TO K,
A/1 TO 2, K/1 TO 2 & L/3 TO 5 & K/5 TO 6 TO 4 FOOT AFFE
10/05/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
12" MASONRY CMU WALL 1ST LIFT REINFORCEMENT STEEL
@ GRID LINES 6/D.5 TO F.5 & J/3.4 TO 6
10/04/2007 REINFORCED MASONRY PRE-GROUT Not ready for Inspection IVRS - Inspection :*