Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - INTERMEDIATE
Permit Number - T07CM01655
Inspection Description - ELECTRIC - INTERMEDIATE
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/25/2008 | ELECTRIC - INTERMEDIATE | Approved | IVRS - Inspection :* | |
12/05/2007 | ELECTRIC - INTERMEDIATE | Partial Approval | IVRS - Inspection :* | |
11/28/2007 | ELECTRIC - INTERMEDIATE | Partial Approval | IVRS - Inspection :* | |
11/09/2007 | ELECTRIC - INTERMEDIATE | Partial Approval | IVRS - Inspection :* | |
11/08/2007 | ELECTRIC - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1. OK RELOCATED CHARGING STATION 2. ENSURE ALL ROOFTOP UNITS PROPERLY FUSED 3. OK RECEPTACLE FOR RECEIVING DESK 4. OK LIGHT AT AGUA FRESCA |
|
11/06/2007 | ELECTRIC - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1. INSTALL EXTENSION BOX AT COOLER IN SEAFOOD DEPT AND INSTALL BLANK COVER. 2. OK CASE RECEPT & RECEPT @ POS IN AGUA FRESCA 3. OK FINAL AT SEAFOOD DEPT |
|
11/05/2007 | ELECTRIC - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* | |
11/02/2007 | ELECTRIC - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1. REVERSE POLARITY ON RECEPT IN FISH AREA 2. OK CEILING FISH DEPT 3. AC-11 OVERFUSED PER NAME PLATE 4. PAN WASHER PLAN CALLS FOR DISCONNECT TO BE NEMA 4X |
|
10/31/2007 | ELECTRIC - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1. OK CORD DROPS AT BAKERY 2. OK CEILING COLUMN LINE 6 TO 8 #2 ROWS OF LIGHTS SOUTH OF COLUMN LINE D TO FRONT OF STORE. |
|
10/26/2007 | ELECTRIC - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* 1. SEAL UNUSED CONDUIT OPENING (2" RIGID) 2. SUPPORT VDV CABLING 725.6, 800.6, 300.11 3. FILL UNUSED OPENINGS IN BOXES 4. OPEN JUNCTION BOX OVER ISLE 5 FOR INSPECTION |
|
10/24/2007 | ELECTRIC - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1. OK CEILING IN PRODUCE AREA 2. OK FLY FANS AT FRONT ENTRIES |
|
10/22/2007 | ELECTRIC - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1. OK WALLS SEAFOOD AREA 2. OK CEILINGS COLUMN LINES D TO C & 6 TO 8 3. OK CEILINGS. BAKERY & DELI LEAVE CEILING OPEN AT TEMP POWER WIRING |
|
10/19/2007 | ELECTRIC - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1. OK WALL SEAFOOD PREP AREA 2. OK CEILING 3 ROWS OF LIGHTS COLUMN LINE D TO C & 6 TO 8 3. OK FINAL ON WALL RECEPT IN AGUA FRESCA 4. RECALL FOR INSPECTION ON REFRIGERATION EQUIPMENT IN AGUA FRESCA |
|
10/15/2007 | ELECTRIC - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1. OK LIGHTS IN PRODUCE COOLERS/WALK-INS 2. OK RECEPT FOR R.O SYSTEM @ PRODUCE 3. OK CEILING FRONT OF STORE FIRST 3 ROWS OF LIGHTS |
|
10/11/2007 | ELECTRIC - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1. OK FINAL AT FLORAL KIOSK 2. OK DONUT CASE LIGHTING 3. OK CEILING AT REGISTERS UP TO CHASE SIGN 4. OK ROUGH WALL AT SEAFOOD AREA |
|
10/04/2007 | ELECTRIC - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1) OK GEC TO WATER PIPING XFMR TL 2) OK GFI RECEPTACLES AT CAKE CASE PREP AREA 3) BONDING BUSHING INSTALLED AT ELECTRIC OVEN 4) OK CEILING FROM REGISTER #1 TO DELI OUTSIDE OLD SOFFIT LINE 5) OK 2 NEW GFI RECEPTACLES FOR VENDING MACHINES OUTSIDE |
|
10/02/2007 | ELECTRIC - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1. OK WALLS AT AGUA FRESCA 2. INSTALL BONDING BUSHING ON CONNECTION TO ELECTRIC OVEN 3. OK DOUBLE RACK PROOFER & OVEN. INSTALL FUSES IN DISCONNECTS 4. OK CEILING FROM REGISTER #1 TO REGISTER #8 5. BOND GEC FOR TRANSFORMER TL TO WATER PIPING IN AREA 6. OK EXHAUST FAN EF-6 |
|
09/27/2007 | ELECTRIC - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* | |
09/25/2007 | ELECTRIC - INTERMEDIATE | Partial Approval | IVRS - Inspection :* | |
09/21/2007 | ELECTRIC - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1. OK FRONT WALL OF STORE CASH REGISTER AREA 2. OK CEILINGS COLUMN LINE B TO D & 11 TO BAKERY/DELI WALL |
|
09/18/2007 | ELECTRIC - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1. OK GFI DISHWASHING AREA 2. OK GFI DELI AREA 3. OK CORD DROP FOR CHICKEN WARMER 4. OK 3 RECEPTACLES ABOVE BEER COOLERS 5. OK QUAD RECEPTACLE AT COFFEE GRINDER 6. OK LIGHTING AT CANDY DISPLAYS 7. OK LIGHTING AT SODA ISLE 8. REMOVE TAPE AT MC CONNECTIONS 9. OK RECEPTACLES/LIGHTS AT CARD DISPLAY |
|
09/14/2007 | ELECTRIC - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* CANCELLED BY CONTRACTOR |
|
09/13/2007 | ELECTRIC - INTERMEDIATE | Partial Approval | IVRS - Inspection :* | |
09/11/2007 | ELECTRIC - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1. OK WALL AT BAKERY 2. OK DISCONNECTS FOR REMOTE HEADERS 2 & 3 3. OK RECEPTACLES FOR NEW FRYERS & ROTISSIERE 4. OK SPOT COOLERS DAIRY WALK IN 5. OK SPOT COOLER PRODUCE PREP 6. OK SPOT COOLER PRODUCE FREEZER |
|
09/10/2007 | ELECTRIC - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* CANCELLED BY CONTRACTOR |
|
09/04/2007 | ELECTRIC - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1. OK CEILING CHECK CASHING ROOM 2. OK FINAL CHECK CASHING ROOM 3. OK GFI RECEPTACLES AT BAKERY PREP TABLE 4. OK LIGHTS IN DAIRY COOLER |
|
08/31/2007 | ELECTRIC - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1. OK CEILING BREAKROOM 2. OK FLOOR BOXES IN SEASONAL AREA 3. OK CEILING IN HALLWAY TO RESTROOMS 4. OK LIGHTS DELI FREEZER 5. OK LIGHTS BAKERY COOLER & FREEZER |
|
08/21/2007 | ELECTRIC - INTERMEDIATE | Partial Approval | IVRS - Inspection :* PHARMACY CEILING 1. WIRE 2X4 FIXTURES PROPERLY 2. SECURE ALL 2X4 FIXTURES TO GRID 3. GET MC CABLE UP OFF OF GRID & SECURE PROPERLY 4. SECURE 3/4" EMT WITHIN 3' OF 8" X 8 J.B 5. GET LOW VOLTAGE CABLE UP OFF OF GRID FOR OCCUPANCY SENSORS. 6. HAVE OPEN JUNCTION BOXES IN CEILING PRODUCE AREA: OK 3/4" EMT & WIRING TO PRODUCE TABLES |
|
08/14/2007 | ELECTRIC - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1. OK UNDERGROUND RACEWAYS AT DAIRY CASES 2. OK NEW PRODUCE CASES 3. OK DISCONNECT AT REMOVE HEADER #1 4. OK WALLS CHECK CASHING ROOM 5. BOX RELOCATED ABOVE HARD LID PHARMACY RESTROOM |
|
08/08/2007 | ELECTRIC - INTERMEDIATE | Partial Approval | IVRS - Inspection :* | |
08/07/2007 | ELECTRIC - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1. BROKEN COVERS ON GFI RECEPT. IN PRODUCE PREP 2. AC EQUIPMENT NOT READY IN PRODUCE PREP 3. STRAP FLEX TO GARBAGE DISPOSAL PRODUCE PREP 4. POWER OK IN BREAK ROOM 5. NEED CEILING INSPECTION BREAKROOM. WAITING ON LIGHTING PACKAGE 6. NEED TO CALL FINALS ON AREAS BEFORE OCCUPYING 7. OK ELECTRIC ROUGH FOR HOOD WALL IN DELI 8. OK PANEL WALL IN DELI 9. OK WALLS PHARMACY 10. BOX ABOVE HARD LID PHARMACY RESTROOM |
|
07/18/2007 | ELECTRIC - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. BOX OVERFILL ON DEFROST JUNCTION BOXES -- NEC 314.16 2. BONDING JUMPER TO BOXES TO BE #10 -- NEC 250.122 3. STRAP METAL FLEX PER -- NEC 348.30 4. WATCH WIRE FILL IN WIREWAYS -- NEC 376.22 |
|
07/17/2007 | ELECTRIC - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1. OK BREAKROOM WALLS 2. INSTALL MAIN BONDING JUMPER IN TRANSFORMER FOR DEFROST CABINET 3. CONTACT ENGINEER ABOUT GROUNDING ELECTRODE SYSTEM FOR DEFROST CABINET TRANSFORMER 4. ENSURE HVAC CONTRACTOR CALL FOR INSPECTIONS ON ALL ELECTRICAL INSTALLATIONS DONE BY THEIR ELECTRICAL CONTRACTOR. |
|
07/12/2007 | ELECTRIC - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1. OK WIRING IN CUSTOMER SERVICE CABINETS 2. OK CEILING IN PUBLIC BATHROOMS |
|
07/10/2007 | ELECTRIC - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1. OK WALLS IN PUBLIC RESTROOMS 2. OK TEMP POWER FOR TRAILER & TEMP CHARGING STATION |