Inspection History Details
Inspection Status: Approved
Inspection History: EXT METAL CLIPS/EXT SHEATHING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/27/2007 | EXT METAL CLIPS/EXT SHEATHING | Approved | IVRS - Inspection :* | |
| 06/26/2007 | EXT METAL CLIPS/EXT SHEATHING | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) NO PRIOR INSPECTION REPORT ON SITE 2) PROVIDE ENGINEERS/SPECIAL INSPECTION REPORT FOR REPLACED HOLDOWN |
|
| 06/15/2007 | EXT METAL CLIPS/EXT SHEATHING | Partial Approval | IVRS - Inspection :* 1) OK TO GET READY FOR STUCCO MESH, WILL BE ABLE TO RE-INSPECT AT INTERMEDIATE 2) RETRO NOT IN PLACE-UNABLE TO GET REQUIRED DEPTH ON ANCHOR BOLT TO RETRO DUE TO SOMETHING (REBAR) IN FOOTER SLAB. NEED TO GET ENGINEER APPROVAL AS TO WERE TO LOCATE HOLDOWN. WILL NEED ENGINEER RELOCATIONS |
|
| 06/12/2007 | EXT METAL CLIPS/EXT SHEATHING | Denied | IVRS - Inspection : A reinspection fee has been assessed for this inspection. Multiple inspection Holdowns require .162 x 3 1/2" nails commons 2 1/2" nails used Nails for holdowns must nail into studs S.E. shearwall north holdown wrong location-repeat Refee |
|
| 06/11/2007 | EXT METAL CLIPS/EXT SHEATHING | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) HOLDOWNS NOT NAILED INTO STUDS 2) S.E. HOLDOWN WRONG LOCATION-PROVIDE RETRO 3) S. SHEARWALL NOT 10 FT LONG 4) WEDGE ANCHORS NOT ALLOWED ON EXTERIOR SHEARWALLS 5) SEE ITEMS 1,2,3,4,5 & 10 FROM 6/5/07 |
|
| 06/05/2007 | EXT METAL CLIPS/EXT SHEATHING | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) PAHD 42 HOLDOWNS REQUIRE 3 1/2" X .162 NAILS PRESENTLY 3" X .131-REPLACE NAILS IN ALL HOLDOWNS 2) S.E. CORNER NORTH HOLDOWN IN WRONG LOCATION. PROVIDE ENGINEERS APPROVED ? IN CORRECT LOCATION 3) SOUTH #9 SHEARWALL MUT BE 10 FT LONG MINIMUM 4) WEDGE ANCHORS NOT ALLOWED ON FIRST FLOOR SHEAR EXTERIOR WALLS-MUST USE TAP CONS OR EQUAL. REMOVE NUTS FROM WEDGE 5) SECOND FLOOR SILL PLATE NOT SUPPORTED ON FLOOR SHEATHING 6) ENTRY REQUIRES 1 TRIMMER 2 KING STUDS 7) STAIR GIRDER REQUIRES 2-2 X POSTS 2 LOCATIONS 8) REPLACE DAMAGED HANGER AT STAIRS 9) EAST END OF STAIR HEADER MUST BEAR ON POST NOT HANGER 10) PROVIDE DETAIL FOR STAIR HEADER WEST END WHEN OPEN WEBB TRUSS USED TWO LOCATIONS |