Permit: T07CM01615

Parcel: 135061470

Inspection Status: Approved

Inspection History: MECHANICAL - FINAL

Date Description Inspector Results Comments
05/21/2007 MECHANICAL - FINAL Approved IVRS - Inspection :*
05/14/2007 MECHANICAL - FINAL Partial Approval IVRS - Inspection :*
DO NOT USE FLEX COPPER ON A T&P RELIEF DRAIN.
PROVIDE A 90 DEG. ELBOW ON PRESSURE RELIEF OUTSIDE.
DO NOT REDUCE CONDENSATE PUMP DRAIN TO 1/4" ON THE ROOF - CONTINUE WITH 3/8" & BLOCK & CLAMP EVERY 6'
04/25/2007 MECHANICAL - FINAL Not ready for Inspection IVRS - Inspection :*
1. SHALL PROVIDE SEDIMENT TRAPS FOR GAS ENTRY TO WATER HEATER & FURNACE.
2. WATER HEATER TEMPERATURE & PRESSURE RELIEF SHALL GRAVITY DRAIN TO DAYLIGHT OR PROVIDE CITY SIGNED PETITION OF APPEAL ON SITE FOR ALTERNATE FORM OF TEMPERATURE AND PRESSURE RELIEF WITH CORRECT INSTALLATION.
3. PROVIDE OVERFLOW SENSOR IN CONDENSATE PAN CORRECTLY INSTALLED.
4. CONDENSATE PUMP DRAIN TO TERMINATE TO
APPROVED LOCATION AND BE SUPPORTED CORRECTLY
(NOT TO ROOF VENT)
5. VENT FROM WATER HEATER/FURNACE TO BE EXTENDED WITH DOUBLE WALL VENT PIPING. MINIMUM 2' ABOVE TOP OF COOLER INTAKE WHEN WITHIN 10' OF COOLER INTAKE.