Inspection History Details
Inspection Status: Approved
Inspection History: MECHANICAL - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/21/2007 | MECHANICAL - FINAL | Approved | IVRS - Inspection :* | |
| 05/14/2007 | MECHANICAL - FINAL | Partial Approval | IVRS - Inspection :* DO NOT USE FLEX COPPER ON A T&P RELIEF DRAIN. PROVIDE A 90 DEG. ELBOW ON PRESSURE RELIEF OUTSIDE. DO NOT REDUCE CONDENSATE PUMP DRAIN TO 1/4" ON THE ROOF - CONTINUE WITH 3/8" & BLOCK & CLAMP EVERY 6' |
|
| 04/25/2007 | MECHANICAL - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. SHALL PROVIDE SEDIMENT TRAPS FOR GAS ENTRY TO WATER HEATER & FURNACE. 2. WATER HEATER TEMPERATURE & PRESSURE RELIEF SHALL GRAVITY DRAIN TO DAYLIGHT OR PROVIDE CITY SIGNED PETITION OF APPEAL ON SITE FOR ALTERNATE FORM OF TEMPERATURE AND PRESSURE RELIEF WITH CORRECT INSTALLATION. 3. PROVIDE OVERFLOW SENSOR IN CONDENSATE PAN CORRECTLY INSTALLED. 4. CONDENSATE PUMP DRAIN TO TERMINATE TO APPROVED LOCATION AND BE SUPPORTED CORRECTLY (NOT TO ROOF VENT) 5. VENT FROM WATER HEATER/FURNACE TO BE EXTENDED WITH DOUBLE WALL VENT PIPING. MINIMUM 2' ABOVE TOP OF COOLER INTAKE WHEN WITHIN 10' OF COOLER INTAKE. |