Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESS TEST FNL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/17/2007 | PLUMBING - GAS PRESS TEST FNL | Approved | IVRS - Inspection :* PROVIDE APPROVED PIPING CPVC, COPPER FOR T&P TO DAYLIGHT AND 90 DEG. DOWN 6" TO 24" OFF GRADE AND CALL BACK FOR FINAL |
|
| 04/27/2007 | PLUMBING - GAS PRESS TEST FNL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. REMOVE OLD PIPING FROM OLD METER LOCATION, DROP NEW PIPE DOWN TO WATER HEATER LOCATION. 2. INSTALL FLASHING AT ROOF PENETRATIONS RETEST SYSTEM 3. PIPE T&P RELIEF DRAIN TO EXTERIOR, TERMINATE 6" ABOVE GROUND, USE MATERIALS APPROVED FOR HW. 4. INSTALL TYPE B VENT AT WH VENT PENETRATION THROUGH CEILING AND ROOF. TERMINATE W/LISTED B VENT CAP. 5. CAP UNUSED VALVE AT DRYER. |
|
| 04/24/2007 | PLUMBING - GAS PRESS TEST FNL | Not ready for Inspection | NOBODY HOME |