Inspection History Details
Inspection Status: Approved
Inspection History: FRAMING
Permit Number - T07CM01578
Inspection Description - FRAMING
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/19/2007 | FRAMING | Approved | IVRS - Inspection :* | |
07/18/2007 | FRAMING | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) ADD POST UNDER BEAM AT STAIRS 2) NEED 2 X 8 HEADER AT INTERIOR WALL PER PLANS AT MASTER 3) NEED 2 X 12 HEADER AT FRONT BEDROOM PER PLANS 4) COMPLETE LATHE AT MAIN PANEL AND CAULK ALL PENETRATIONS 5) ADD NAIL PLATES OR MAINTAIN 1 1/4" FROM STUD FACE WITH ROMEX 6) COMPLETE ALL MAKE UP OF BOXES WITH ROMEX 7) LEAK AT MAIN SERVICE AT GARAGE 8) COMPLETE MECHANICAL DUCT WORK AND CANS AND BLOCKOUTS |