Permit: T07CM01553

Parcel: 12810080A

Inspection Status: Approved

Inspection History: ENGINEERING - FINAL

Date Description Inspector Results Comments
08/17/2007 ENGINEERING - FINAL Approved ALL SITE WORK FOR T05BU01786 COMPLETE
06/20/2007 ENGINEERING - FINAL Not ready for Inspection -TRUNCATED DOMES NOT YET PAINTED
-SANDBLASTING OF SIDEWALKS STILL ONGOING
-SPLASH PADS (RIP RAP) NOT INSTALLED
-TRUNCATED DOMES AT NW CORNER NOT INSTALLED
-LANDSCAPE MATERIAL STILL IN PARKING LOT INCLUDING PLANTS/TREES
-WALL AT TRANSFORMER NE SIDE OF BUILDING NOT CP
-GATES NOT INSTALLED AT TRASH ENCLOSURE
-BASIN NOT COMPLETE
06/19/2007 ENGINEERING - FINAL Not ready for Inspection -ALL DRAINAGE STRUCTURES NEED TO BE IN PLACE INCLUDING RIP RAP
-ALL PEDESTRIAN ACCESS MUST BE COMPLETE
-PER LEE RAY TRUNCATED DOMES CAN BE PAINTED 70% CONTRASTING COLOR
04/20/2007 ENGINEERING - FINAL Denied NO ASPHALT
NO CURBING
NO SIDEWALK
SITE WORK NOT DONE