Permit: T07CM01521

Inspection Status: Approved

Inspection History: ELECTRIC - SERVICE UPGRADE

Date Description Inspector Results Comments
08/07/2007 ELECTRIC - SERVICE UPGRADE Approved IVRS - Inspection :*
08/02/2007 ELECTRIC - SERVICE UPGRADE Not ready for Inspection IVRS - Inspection :*
08/01/2007 ELECTRIC - SERVICE UPGRADE Not ready for Inspection IVRS - Inspection :*
WORK IN PROGRESS
1. BONDING CONDUCTOR FOR GUTTER FEEDER RACEWAY UNDERSIZED AT CLAMP
07/24/2007 ELECTRIC - SERVICE UPGRADE Denied IVRS - Inspection :
The service is not per code.| 210*
INSPECTION FOR SERVICE EQUIPMENT ONLY
1. SERVICE DISCONNECTS TO BE GROUPED TOGETHER, SERVICE DISCONNECT FOR "DSB" IS REMOTE FROM ALL OTHER SERVICE DISCONNECTS, IN VIOLATION OF NEC 230.72A
2. FROM CALCULATIONS PROVIDED ON PLANS, 500 MCM SERVICE CONDUCTORS APPEAR UNDERSIZED TO HANDLE "EXISTING" LOADS - NEC 230.42, 310.15
3. TIGHTEN ALL GROUNDING AND BONDING CONNECTIONS
4. BOND SERVICE PULL BOX - NEC 230.92, 250.102C
5. BOND SERVICE RACEWAY TO GUTTER - NEC 250.92, 250.102C
6. IDENTIFY SERVICE DISCONNECTS
7. INSTALL MAIN BONDING BUSS, PANEL "DSB"